IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15,451

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0388 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,869 $480 Implemented
IA0388 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,922 $52 Implemented
IA0388 # 07 Y:2006 07 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,279 $1,972 Not Implemented
IA0388 # 08 Y:2006 08 2006 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $47,693 $45,600 Implemented
AS0420 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,359 $18,572 Implemented
AS0420 # 02 Y:2006 02 2006 UPGRADE CONTROLS ON COMPRESSORS $2,260 $10,000 Not Implemented
AS0420 # 03 Y:2006 03 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,254 $3,300 Not Implemented
AS0420 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,765 $1,000 Not Implemented
AS0420 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,338 $5,000 Implemented
AS0420 # 06 Y:2006 06 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $885 $13,820 Implemented
WI0516 # 01 Y:2006 01 2006 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $987,800 $0 Not Implemented
WI0516 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,265 $33,480 Implemented
WI0516 # 03 Y:2006 03 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,330 $1,600 Not Implemented
WI0516 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $5,311 $1,000 Implemented
WI0516 # 05 Y:2006 05 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,187 $325 Not Implemented
WI0516 # 06 Y:2006 06 2006 INSTALL TIMERS AND/OR THERMOSTATS $1,556 $200 Not Implemented
WI0516 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,352 $2,560 Implemented
AM0512 # 01 Y:2006 01 2006 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $48,200 $0 Implemented
AM0512 # 02 Y:2006 02 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,440 $0 Implemented
AM0512 # 03 Y:2006 03 2006 RECOVER AND REUSE WASTE MATERIAL $6,200 $9,135 Not Implemented
AM0512 # 04 Y:2006 04 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,820 $0 Not Implemented
AM0512 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,965 $860 Implemented
AM0512 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,020 $0 Implemented
AM0512 # 07 Y:2006 07 2006 REUSE RAGS UNTIL COMPLETELY SOILED $1,300 $0 Not Implemented
AM0512 # 08 Y:2006 08 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $800 $0 Not Implemented