IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15,451

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NV0108 # 06 Y:1998 06 1998 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $794 $220 Implemented
AR0143 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,674 $300 Not Implemented
AR0143 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $269 $460 Implemented
AR0143 # 03 Y:1998 03 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $619 $0 Implemented
AR0143 # 04 Y:1998 04 1998 INSTALL SET-BACK TIMERS $1,859 $2,080 Implemented
AR0143 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,363 $150 Implemented
AR0143 # 06 Y:1998 06 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $383 $120 Not Implemented
AR0143 # 07 Y:1998 07 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $6,960 $10,000 Implemented
AR0143 # 08 Y:1998 08 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $12,233 $2,000 Implemented
AR0143 # 09 Y:1998 09 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $19,710 $2,250 Implemented
AR0143 # 10 Y:1998 10 1998 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $584 $337 Not Implemented
UF0207 # 01 Y:1998 01 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,410 $0 Implemented
UF0207 # 02 Y:1998 02 1998 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,168 $648 Not Implemented
UF0207 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,651 $1,688 Not Implemented
UF0207 # 04 Y:1998 04 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,217 $1,396 Not Implemented
UF0207 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,914 $1,700 Implemented
UF0207 # 06 Y:1998 06 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,587 $0 Implemented
UF0207 # 07 Y:1998 07 1998 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,133 $3,240 Not Implemented
UF0207 # 08 Y:1998 08 1998 PREHEAT COMBUSTION AIR WITH WASTE HEAT $14,389 $18,400 Not Implemented
UF0207 # 09 Y:1998 09 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $5,662 $0 Implemented
UF0207 # 10 Y:1998 10 1998 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $31,783 $5,000 Implemented
UF0207 # 11 Y:1998 11 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $4,680 $5,500 Not Implemented
WI0329 # 01 Y:1998 01 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $22,908 $1,500 Implemented
WI0329 # 02 Y:1998 02 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,336 $0 Implemented
WI0329 # 03 Y:1998 03 1998 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,092 $400 Implemented