Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
15,260
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0526 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,717 | $1,900 | Implemented |
LE0526 # 06 Y:2022 | 06 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,615 | $3,540 | Implemented |
LE0526 # 07 Y:2022 | 07 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $728 | $1,800 | Not Implemented |
LE0526 # 08 Y:2022 | 08 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $18,661 | $48,235 | Implemented |
LE0526 # 09 Y:2022 | 09 | 2022 | CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS | $37,269 | $125,000 | Not Implemented |
WV0623 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $72,629 | $104,885 | Implemented |
WV0623 # 02 Y:2022 | 02 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $61,441 | $127,733 | Implemented |
WV0623 # 03 Y:2022 | 03 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $51,704 | $257,600 | Implemented |
WV0623 # 04 Y:2022 | 04 | 2022 | RECYCLE WHITE WATER | $19,492 | $11,082 | Not Implemented |
WV0623 # 05 Y:2022 | 05 | 2022 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $19,461 | $91,800 | Not Implemented |
WV0623 # 06 Y:2022 | 06 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $14,348 | $3,600 | Not Implemented |
WV0623 # 07 Y:2022 | 07 | 2022 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $12,693 | $51,500 | Not Implemented |
WV0623 # 08 Y:2022 | 08 | 2022 | REDUCE VENTILATION AIR | $8,396 | $19,558 | Not Implemented |
WV0623 # 09 Y:2022 | 09 | 2022 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $6,154 | $13,600 | Not Implemented |
WV0623 # 10 Y:2022 | 10 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,877 | $2,813 | Implemented |
WV0623 # 11 Y:2022 | 11 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $1,756 | $299 | Implemented |
WV0623 # 12 Y:2022 | 12 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,660 | $3,000 | Implemented |
WV0623 # 13 Y:2022 | 13 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,487 | $990 | Implemented |
WV0623 # 14 Y:2022 | 14 | 2022 | DEVELOP A REPAIR/REPLACE POLICY | $1,356 | $2,300 | Implemented |
WV0623 # 15 Y:2022 | 15 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $1,341 | $4,835 | Implemented |
WV0623 # 16 Y:2022 | 16 | 2022 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $313 | $1,500 | Not Implemented |
AM0848 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,136 | $13 | Not Implemented |
AM0848 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,821 | $1,000 | Implemented |
AM0848 # 03 Y:2022 | 03 | 2022 | INSTALL OCCUPANCY SENSORS | $889 | $1,568 | Implemented |
AM0848 # 04 Y:2022 | 04 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $149 | $408 | Implemented |