Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
15,265
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0036 # 03 Y:1994 | 03 | 1994 | INSTALL OCCUPANCY SENSORS | $1,751 | $4,080 | Not Implemented |
SF0036 # 04 Y:1994 | 04 | 1994 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,893 | $3,880 | Implemented |
SF0036 # 05 Y:1994 | 05 | 1994 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,020 | $40 | Implemented |
SF0036 # 06 Y:1994 | 06 | 1994 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,557 | $1,457 | Not Implemented |
SF0036 # 07 Y:1994 | 07 | 1994 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,419 | $7,395 | Not Implemented |
UD0440 # 01 Y:1994 | 01 | 1994 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $7,448 | $0 | n/a |
UD0440 # 02 Y:1994 | 02 | 1994 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,640 | $250 | n/a |
UD0440 # 03 Y:1994 | 03 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,786 | $3,000 | n/a |
UD0440 # 04 Y:1994 | 04 | 1994 | ADD AREA LIGHTING SWITCHES | $2,496 | $200 | n/a |
UD0440 # 05 Y:1994 | 05 | 1994 | ADD AREA LIGHTING SWITCHES | $1,454 | $200 | n/a |
WV0045 # 01 Y:1994 | 01 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $530 | $740 | Implemented |
WV0045 # 02 Y:1994 | 02 | 1994 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $2,284 | $960 | Not Implemented |
WV0045 # 03 Y:1994 | 03 | 1994 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,030 | $4,400 | Not Implemented |
WV0045 # 04 Y:1994 | 04 | 1994 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,270 | $960 | Implemented |
WV0045 # 05 Y:1994 | 05 | 1994 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $960 | $18 | Implemented |
WV0045 # 06 Y:1994 | 06 | 1994 | USE SYNTHETIC LUBRICANT | $156 | $0 | Not Implemented |
WV0045 # 07 Y:1994 | 07 | 1994 | INSTALL TIMERS AND/OR THERMOSTATS | $1,511 | $900 | Implemented |
WV0042 # 01 Y:1994 | 01 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,279 | $7,375 | Implemented |
WV0042 # 02 Y:1994 | 02 | 1994 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,921 | $0 | Not Implemented |
WV0042 # 03 Y:1994 | 03 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,094 | $1,372 | Implemented |
WV0042 # 04 Y:1994 | 04 | 1994 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,973 | $440 | Not Implemented |
WV0042 # 05 Y:1994 | 05 | 1994 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,391 | $4,400 | Not Implemented |
WV0042 # 06 Y:1994 | 06 | 1994 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $11,021 | $6,660 | Not Implemented |
WV0042 # 07 Y:1994 | 07 | 1994 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $340 | $200 | Implemented |
WV0042 # 08 Y:1994 | 08 | 1994 | USE SYNTHETIC LUBRICANT | $2,246 | $0 | Not Implemented |