IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15,265

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0199 # 05 Y:1994 05 1994 RECOVER WASTE HEAT FROM EQUIPMENT $1,504 $600 Not Implemented
WI0199 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $725 $640 Implemented
WI0199 # 07 Y:1994 07 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $726 $1,000 Implemented
WI0199 # 08 Y:1994 08 1994 INSULATE BARE EQUIPMENT $342 $77 Implemented
SF0017 # 01 Y:1994 01 1994 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $64,588 $172,000 n/a
SF0017 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $15,358 $15,212 n/a
SF0017 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,285 $4,058 n/a
SF0017 # 04 Y:1994 04 1994 ADD AREA LIGHTING SWITCHES $26,202 $2,990 n/a
SF0017 # 05 Y:1994 05 1994 INSTALL OCCUPANCY SENSORS $3,582 $1,470 n/a
SF0017 # 06 Y:1994 06 1994 OPTIMIZE PLANT POWER FACTOR $3,945 $7,558 n/a
SF0017 # 07 Y:1994 07 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $5,641 $3,560 n/a
SF0017 # 08 Y:1994 08 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,564 $488 n/a
SF0017 # 09 Y:1994 09 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,917 $2,400 n/a
WI0195 # 01 Y:1993 01 1993 OPTIMIZE PLANT POWER FACTOR $21,307 $17,400 Implemented
WI0195 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,291 $3,946 Not Implemented
WI0195 # 03 Y:1993 03 1993 INSTALL OCCUPANCY SENSORS $247 $150 Not Implemented
WI0195 # 04 Y:1993 04 1993 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,037 $1,050 Not Implemented
WI0195 # 05 Y:1993 05 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $859 $0 Not Implemented
WI0195 # 06 Y:1993 06 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $206 $350 Not Implemented
WI0195 # 07 Y:1993 07 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $671 $0 Implemented
WI0195 # 08 Y:1993 08 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $384 $588 Not Implemented
WI0195 # 09 Y:1993 09 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $132 $0 Not Implemented
WI0195 # 10 Y:1993 10 1993 INSULATE BARE EQUIPMENT $187 $660 Not Implemented
WV0017 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,540 $2,498 Implemented
WV0017 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $567 $2,760 Not Implemented