IAC logo
IAC Assessment: BD0005
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0005
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1994
Principal Product Air Cannons, Industrial Vibrators and Flow Aid Devices
NAICS n/a
SIC 3531 - Construction Machinery
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 145,572
Annual Production 165,000 Pieces
Production Hrs. Annual 7,200
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $176,558 2,407,093 kWh $0.07
Natural Gas $6,722 1,613 MMBtu $4.17
TOTAL ENERGY COSTS $183,280
RECOMMENDED SAVINGS* $83,012 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,755
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,475
Cost:
$22,315
$6,475 88,218 - - $6,475
88,218
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,194
Cost:
$4,456
$2,194 29,894 - - $2,194
29,894
kWh
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,322
Cost:
$150
$1,322 18,171 - - $1,322
18,171
kWh
-
-
MMBtu
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,870
Cost:
$3,200
$1,870 25,498 - - $1,870
25,498
kWh
-
-
MMBtu
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$3,894
Cost:
$1,000
$3,894 53,048 - - $3,894
53,048
kWh
-
-
MMBtu
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$41,565
Cost:
$17,500
$61,285 835,580 $(-19,720) (-4,729) $61,285
835,580
kWh
$(-19,720)
(-4,729)
MMBtu
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,035
Cost:
$6,000
$2,035 27,843 - - $2,035
27,843
kWh
-
-
MMBtu
08: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$23,657
Cost:
$62,000
$31,913 435,229 $(-8,256) (-1,980) $31,913
435,229
kWh
$(-8,256)
(-1,980)
MMBtu
TOTAL RECOMMENDED Savings:
$83,012
Cost:
$116,621
$110,988 1,513,481 $(-27,976) (-6,709) $110,988
1,513,481
kWh
$(-27,976)
(-6,709)
MMBtu
TOTAL IMPLEMENTED Savings:
$15,755
Cost:
$31,121
$15,755 214,829 - - $15,755
214,829
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas