IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

509

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0533 # 06 Y:2016 06 2016 UPGRADE CONTROLS ON COMPRESSORS $8,986 $20,750 Not Implemented
WV0533 # 07 Y:2016 07 2016 INSTALL OCCUPANCY SENSORS $8,138 $4,160 Not Implemented
WV0533 # 08 Y:2016 08 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,301 $4,100 Not Implemented
WV0533 # 09 Y:2016 09 2016 ISOLATE HOT OR COLD EQUIPMENT $4,874 $5,100 Not Implemented
WV0533 # 10 Y:2016 10 2016 DEVELOP A REPAIR/REPLACE POLICY $3,084 $665 Implemented
WV0533 # 11 Y:2016 11 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,697 $300 Implemented
WV0533 # 12 Y:2016 12 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,004 $2,230 Implemented
WV0533 # 13 Y:2016 13 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $770 $2,150 Implemented
WV0533 # 14 Y:2016 14 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $558 $0 Implemented
WV0533 # 15 Y:2016 15 2016 INSULATE BARE EQUIPMENT $218 $470 Implemented
LE0422 # 12 Y:2016 12 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $55,094 $185,000 Not Implemented
LE0422 # 11 Y:2016 11 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,926 $6,250 Not Implemented
LE0422 # 10 Y:2016 10 2016 INSTALL OCCUPANCY SENSORS $713 $2,175 Not Implemented
LE0422 # 09 Y:2016 09 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,319 $3,000 Implemented
LE0422 # 08 Y:2016 08 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $990 $1,500 Not Implemented
LE0422 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,924 $3,037 Not Implemented
LE0422 # 06 Y:2016 06 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,304 $1,350 Implemented
LE0422 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,151 $1,000 Implemented
LE0422 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,358 $415 Not Implemented
LE0422 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $3,645 $510 Not Implemented
LE0422 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $1,594 $218 Not Implemented
LE0422 # 01 Y:2016 01 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $21,631 $2,000 Not Implemented
LE0417 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,659 $62,300 Implemented
LE0417 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,120 $22,015 Implemented
LE0417 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,602 $25,000 Implemented