Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
15,260
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0249 # 04 Y:2021 | 04 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,213 | $100 | Not Implemented |
UA0249 # 05 Y:2021 | 05 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,261 | $8,080 | Implemented |
CW0119 # 01 Y:2021 | 01 | 2021 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,804 | $0 | Implemented |
CW0119 # 02 Y:2021 | 02 | 2021 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $3,402 | $1,640 | Implemented |
CW0119 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,554 | $0 | Not Implemented |
CW0119 # 04 Y:2021 | 04 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,741 | $613 | Not Implemented |
CW0119 # 05 Y:2021 | 05 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,381 | $6,000 | Implemented |
CW0119 # 06 Y:2021 | 06 | 2021 | IMPROVE LUBRICATION PRACTICES | $21,048 | $10,400 | Not Implemented |
CW0119 # 07 Y:2021 | 07 | 2021 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $5,837 | $1,000 | Implemented |
OR0748 # 01 Y:2022 | 01 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,763 | $1,880 | Implemented |
OR0748 # 02 Y:2022 | 02 | 2022 | FILTER AND REUSE HYDRAULIC OIL | $34,830 | $88,699 | Implemented |
OR0748 # 03 Y:2022 | 03 | 2022 | OPTIMIZE PLANT POWER FACTOR | $3,913 | $10,533 | Implemented |
OR0748 # 04 Y:2022 | 04 | 2022 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $99,431 | $292,453 | Implemented |
OR0748 # 05 Y:2022 | 05 | 2022 | INSULATE BARE EQUIPMENT | $2,032 | $9,520 | Implemented |
CL2113 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $34,351 | $62,500 | n/a |
CL2113 # 02 Y:2021 | 02 | 2021 | MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS | $35,000 | $12,000 | n/a |
CL2113 # 03 Y:2021 | 03 | 2021 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,986 | $400 | n/a |
UD1033 # 01 Y:2022 | 01 | 2022 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $633 | $0 | Not Implemented |
UD1033 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,185 | $2,250 | Not Implemented |
UD1033 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $555 | $676 | Not Implemented |
UD1033 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,955 | $6,000 | Implemented |
UD1033 # 05 Y:2022 | 05 | 2022 | INSTALL OCCUPANCY SENSORS | $2,775 | $800 | Not Implemented |
UD1033 # 06 Y:2022 | 06 | 2022 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,359 | $4,615 | Not Implemented |
WM0168 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,833 | $15,082 | Implemented |
WM0168 # 02 Y:2021 | 02 | 2021 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $10,941 | $0 | Implemented |