Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
15,260
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0016 # 04 Y:2018 | 04 | 2018 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,600 | $5,000 | Not Implemented |
NL0016 # 05 Y:2018 | 05 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,800 | $1,000 | Not Implemented |
NL0016 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,700 | $15,500 | Implemented |
NL0016 # 07 Y:2018 | 07 | 2018 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,600 | $90,000 | Not Implemented |
NL0016 # 08 Y:2018 | 08 | 2018 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $2,200 | $0 | Not Implemented |
IP0093 # 01 Y:2017 | 01 | 2017 | PAY BILLS ON TIME TO AVOID LATE FEES | $4,308 | $0 | Implemented |
IP0093 # 02 Y:2017 | 02 | 2017 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,245 | $0 | Implemented |
IP0093 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,092 | $0 | Implemented |
IP0093 # 04 Y:2017 | 04 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $15,443 | $240 | Implemented |
IP0093 # 05 Y:2017 | 05 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $19,611 | $410 | Implemented |
IP0093 # 06 Y:2017 | 06 | 2017 | INSTALL OCCUPANCY SENSORS | $5,853 | $469 | Implemented |
IP0093 # 07 Y:2017 | 07 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $26,601 | $3,039 | Implemented |
IP0093 # 08 Y:2017 | 08 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $10,674 | $2,715 | Implemented |
IP0093 # 09 Y:2017 | 09 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,248 | $5,271 | Implemented |
IP0093 # 10 Y:2017 | 10 | 2017 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $12,141 | $13,384 | Implemented |
IP0093 # 11 Y:2017 | 11 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,813 | $11,115 | Not Implemented |
IP0093 # 12 Y:2017 | 12 | 2017 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $894 | $2,116 | Not Implemented |
NL0015 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,693 | $189,100 | Implemented |
NL0015 # 02 Y:2017 | 02 | 2017 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,416 | $0 | Implemented |
NL0015 # 03 Y:2017 | 03 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,079 | $12,500 | Not Implemented |
NL0015 # 04 Y:2017 | 04 | 2017 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $3,800 | $0 | Implemented |
NL0015 # 05 Y:2017 | 05 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,190 | $4,500 | Implemented |
IC0199 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,264 | $4,650 | Not Implemented |
IC0199 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,101 | $1,146 | Not Implemented |
IC0199 # 03 Y:2017 | 03 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,964 | $3,000 | Not Implemented |