IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

603

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0463 # 07 Y:2013 07 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $467 $200 Not Implemented
SF0418 # 01 Y:2012 01 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $40,533 $0 Implemented
SF0418 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,408 $0 Implemented
SF0418 # 03 Y:2012 03 2012 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $10,193 $9,787 Not Implemented
SF0418 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,230 $15,467 Implemented
SF0418 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $1,301 $8,388 Implemented
SF0418 # 06 Y:2012 06 2012 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,222 $0 Not Implemented
SF0418 # 07 Y:2012 07 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,705 $0 Not Implemented
SF0418 # 08 Y:2012 08 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $84 $107 Not Implemented
SF0418 # 09 Y:2012 09 2012 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $0 $0 Not Implemented
SD0508 # 01 Y:2011 01 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,207 $100 Implemented
SD0508 # 02 Y:2011 02 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,754 $100 Implemented
SD0508 # 03 Y:2011 03 2011 REPAIR AND ELIMINATE STEAM LEAKS $2,193 $300 Implemented
SD0508 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $4,354 $1,440 Not Implemented
SD0508 # 05 Y:2011 05 2011 INSTALL SET-BACK TIMERS $1,411 $1,000 Implemented
SD0508 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $45,218 $46,656 Not Implemented
SD0425 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,098 $100 Not Implemented
SD0425 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,468 $1,000 Not Implemented
SD0425 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $496 $1,334 Implemented
SD0425 # 05 Y:2010 05 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $42,485 $260,000 Implemented
SD0425 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,908 $100 Not Implemented
SF0381 # 01 Y:2010 01 2010 USE OPTIMUM TEMPERATURE $2,152 $0 Implemented
SF0381 # 02 Y:2010 02 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,764 $7,740 Not Implemented
SF0381 # 03 Y:2010 03 2010 INSULATE BARE EQUIPMENT $4,908 $3,317 Not Implemented
SF0381 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,745 $23,088 Implemented