IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

128

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CL2113 # 02 Y:2021 02 2021 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $35,000 $12,000 n/a
CL2113 # 03 Y:2021 03 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,986 $400 n/a
CL2113 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,351 $62,500 n/a
CL2106 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,356 $2,100 Implemented
CL2106 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,735 $6,460 Not Implemented
CL2106 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $4,370 $5,425 Not Implemented
CL2106 # 04 Y:2021 04 2021 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $40 $160 Not Implemented
CL2015 # 02 Y:2020 02 2020 USE OPTIMUM TEMPERATURE $17,243 $0 Not Implemented
CL2015 # 01 Y:2020 01 2020 MODIFY STARTUP/SHUTDOWN TIMES $7,855 $550 Not Implemented
CL2015 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,229 $4,600 Not Implemented
CL2015 # 03 Y:2020 03 2020 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $53 $0 Not Implemented
CL1902 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,975 $18,832 Implemented
CL1902 # 02 Y:2019 02 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $48 $0 Implemented
CL1902 # 03 Y:2019 03 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $14,447 $39,883 Implemented
CL1807 # 05 Y:2018 05 2018 REPLACE BOILER $1,478 $750 Not Implemented
CL1807 # 01 Y:2018 01 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $51,068 $500 Not Implemented
CL1807 # 03 Y:2018 03 2018 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,718 $15,500 Not Implemented
CL1807 # 02 Y:2018 02 2018 INSTALL OCCUPANCY SENSORS $38,713 $42,563 Not Implemented
CL1807 # 04 Y:2018 04 2018 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $3,717 $3,050 Not Implemented
CL1805 # 02 Y:2018 02 2018 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,183 $13,011 Implemented
CL1805 # 01 Y:2018 01 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $50,691 $506,862 Implemented
CL1805 # 03 Y:2018 03 2018 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $637 $2,500 Not Implemented
CL1702 # 02 Y:2017 02 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,978 $250 Not Implemented
CL1702 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,002 $2,080 Not Implemented
CL1702 # 04 Y:2017 04 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $2,406 $0 Not Implemented