IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0356 # 11 Y:1996 11 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $210 $300 Implemented
CO0356 # 10 Y:1996 10 1996 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $220 $1,170 Not Implemented
CO0356 # 09 Y:1996 09 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,220 $1,500 Implemented
CO0356 # 08 Y:1996 08 1996 REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER $1,340 $1,000 Not Implemented
CO0356 # 07 Y:1996 07 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,540 $8,500 Not Implemented
CO0356 # 06 Y:1996 06 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,750 $1,800 Not Implemented
CO0356 # 05 Y:1996 05 1996 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,060 $33,280 Not Implemented
CO0356 # 04 Y:1996 04 1996 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $4,480 $1,000 Implemented
CO0356 # 03 Y:1996 03 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,340 $10,650 Not Implemented
CO0356 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,050 $21,648 Not Implemented
CO0356 # 01 Y:1996 01 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $12,310 $8,000 Implemented
CO0040 # 12 Y:1985 12 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,066 $1,000 Implemented
CO0040 # 01 Y:1985 01 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $253 $250 Implemented
CO0040 # 11 Y:1985 11 1985 INCREASE AMOUNT OF CONDENSATE RETURNED $3,959 $9,000 Implemented
CO0040 # 10 Y:1985 10 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,094 $5,000 Not Implemented
CO0040 # 09 Y:1985 09 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $555 $700 Implemented
CO0040 # 08 Y:1985 08 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,801 $1,500 Not Implemented
CO0040 # 07 Y:1985 07 1985 INSTALL TURBULATORS $1,268 $500 Implemented
CO0040 # 06 Y:1985 06 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,589 $300 Implemented
CO0040 # 05 Y:1985 05 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,363 $200 Not Implemented
CO0040 # 04 Y:1985 04 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $475 $534 Implemented
CO0040 # 03 Y:1985 03 1985 INSTALL TIMERS AND/OR THERMOSTATS $4,591 $200 Implemented
CO0040 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $666 $500 Implemented