Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsSIC | 351 | Engines And Turbines |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0414 # 09 Y:2022 | 09 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,987 | $2,137 | Implemented |
MI0414 # 08 Y:2022 | 08 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $9,012 | $25,709 | Implemented |
MI0414 # 07 Y:2022 | 07 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $11,441 | $2,980 | Implemented |
MI0414 # 01 Y:2022 | 01 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $40,534 | $120 | Implemented |
MI0414 # 03 Y:2022 | 03 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $35,363 | $35,990 | Implemented |
MI0414 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $26,496 | $1,980 | Implemented |
MI0304 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48,914 | $119,809 | Implemented |
MI0304 # 02 Y:2016 | 02 | 2016 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $30,447 | $53,372 | Implemented |
MI0304 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,015 | $1,700 | Implemented |
MI0304 # 05 Y:2016 | 05 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,470 | $43,770 | Implemented |
MI0304 # 06 Y:2016 | 06 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,388 | $8,320 | Implemented |
MI0304 # 09 Y:2016 | 09 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,968 | $7,680 | Implemented |
MI0304 # 11 Y:2016 | 11 | 2016 | INSTALL OCCUPANCY SENSORS | $1,803 | $662 | Implemented |
MI0304 # 12 Y:2016 | 12 | 2016 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,779 | $3,350 | Implemented |
MI0178 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,720 | $1,210 | Implemented |
MI0178 # 07 Y:2009 | 07 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,282 | $40 | Implemented |
MI0178 # 06 Y:2009 | 06 | 2009 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,908 | $4,531 | Implemented |
MI0178 # 02 Y:2009 | 02 | 2009 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $53,553 | $7,140 | Implemented |
UF0387 # 01 Y:2006 | 01 | 2006 | INSULATE BARE EQUIPMENT | $1,545 | $2,803 | Implemented |
UF0387 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,561 | $2,190 | Implemented |
UF0387 # 06 Y:2006 | 06 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,577 | $370 | Implemented |
UF0387 # 07 Y:2006 | 07 | 2006 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $21,479 | $0 | Implemented |
UF0387 # 08 Y:2006 | 08 | 2006 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,017 | $0 | Implemented |
UF0387 # 09 Y:2006 | 09 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,106 | $6,458 | Implemented |