Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
63
matching recommendationsSIC | 351 | Engines And Turbines |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0414 # 06 Y:2022 | 06 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $20,628 | $8,462 | Not Implemented |
MI0414 # 10 Y:2022 | 10 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,621 | $465 | Not Implemented |
MI0414 # 08 Y:2022 | 08 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $9,012 | $25,709 | Implemented |
MI0414 # 05 Y:2022 | 05 | 2022 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $25,810 | $4,691 | Not Implemented |
MI0414 # 11 Y:2022 | 11 | 2022 | REDUCE HEAT GAIN BY WINDOW TINTING | $302 | $1,470 | Not Implemented |
MI0414 # 07 Y:2022 | 07 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $11,441 | $2,980 | Implemented |
MI0414 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $26,496 | $1,980 | Implemented |
MI0414 # 03 Y:2022 | 03 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $35,363 | $35,990 | Implemented |
MI0414 # 02 Y:2022 | 02 | 2022 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $36,341 | $63,560 | Not Implemented |
MI0414 # 01 Y:2022 | 01 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $40,534 | $120 | Implemented |
MI0414 # 09 Y:2022 | 09 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,987 | $2,137 | Implemented |
MI0304 # 07 Y:2016 | 07 | 2016 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $6,723 | $4,691 | Not Implemented |
MI0304 # 13 Y:2016 | 13 | 2016 | USE PHOTOCELL CONTROLS | $1,570 | $1,120 | Not Implemented |
MI0304 # 12 Y:2016 | 12 | 2016 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,779 | $3,350 | Implemented |
MI0304 # 11 Y:2016 | 11 | 2016 | INSTALL OCCUPANCY SENSORS | $1,803 | $662 | Implemented |
MI0304 # 10 Y:2016 | 10 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,936 | $2,430 | Not Implemented |
MI0304 # 09 Y:2016 | 09 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,968 | $7,680 | Implemented |
MI0304 # 08 Y:2016 | 08 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,720 | $2,320 | Not Implemented |
MI0304 # 06 Y:2016 | 06 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,388 | $8,320 | Implemented |
MI0304 # 05 Y:2016 | 05 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,470 | $43,770 | Implemented |
MI0304 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,015 | $1,700 | Implemented |
MI0304 # 03 Y:2016 | 03 | 2016 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $16,987 | $25,335 | Not Implemented |
MI0304 # 02 Y:2016 | 02 | 2016 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $30,447 | $53,372 | Implemented |
MI0304 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48,914 | $119,809 | Implemented |
MI0178 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,720 | $1,210 | Implemented |