IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 351 Engines And Turbines
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0264 # 11 Y:1999 11 1999 REDUCE SCRAP PRODUCTION $17,940 $0 Not Implemented
ME0264 # 10 Y:1999 10 1999 INSULATE BARE EQUIPMENT $235 $437 Not Implemented
ME0264 # 09 Y:1999 09 1999 INSULATE BARE EQUIPMENT $296 $343 Not Implemented
ME0264 # 08 Y:1999 08 1999 PURCHASE EQUIPMENT INSTEAD OF LEASING $593 $1,340 Not Implemented
ME0264 # 07 Y:1999 07 1999 PAY BILLS ON TIME TO AVOID LATE FEES $615 $0 Not Implemented
ME0264 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,054 $3,010 Not Implemented
ME0264 # 05 Y:1999 05 1999 CHANGE OPERATING CONDITIONS $2,720 $950 Not Implemented
ME0264 # 04 Y:1999 04 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,025 $4,646 Not Implemented
ME0264 # 03 Y:1999 03 1999 USE OPTIMUM THICKNESS INSULATION $3,286 $613 Not Implemented
ME0264 # 02 Y:1999 02 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,088 $2,500 Not Implemented
ME0264 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,149 $1,000 Implemented
ME0263 # 09 Y:1999 09 1999 INSULATE BARE EQUIPMENT $211 $205 Not Implemented
ME0263 # 10 Y:1999 10 1999 REDUCE OR ELIMINATE WASTE $1,040 $150 Implemented
ME0263 # 08 Y:1999 08 1999 PAY BILLS ON TIME TO AVOID LATE FEES $507 $0 Implemented
ME0263 # 07 Y:1999 07 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $788 $375 Not Implemented
ME0263 # 06 Y:1999 06 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,243 $2,041 Implemented
ME0263 # 05 Y:1999 05 1999 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $2,567 $3,410 Not Implemented
ME0263 # 04 Y:1999 04 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,320 $4,374 Not Implemented
ME0263 # 03 Y:1999 03 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $10,208 $4,185 Implemented
ME0263 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,457 $45,260 Not Implemented
ME0263 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,192 $800 Implemented
ME0120 # 01 Y:1994 01 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $25,173 $80,000 Implemented
ME0120 # 05 Y:1994 05 1994 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $1,905 $1,500 Not Implemented
ME0120 # 04 Y:1994 04 1994 DIRECT WARMEST AIR TO COMBUSTION INTAKE $205 $400 Not Implemented
ME0120 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $263 $6,000 Not Implemented