IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 351 Engines And Turbines
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0096 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $522 $771 Not Implemented
IA0096 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,536 $7,244 Implemented
IA0096 # 05 Y:1994 05 1994 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,971 $0 Not Implemented
IA0096 # 08 Y:1994 08 1994 INSTALL OCCUPANCY SENSORS $448 $1,067 Implemented
IA0096 # 04 Y:1994 04 1994 COVER OPEN TANKS $1,597 $3,050 Not Implemented
IA0096 # 03 Y:1994 03 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,098 $25 Not Implemented
IA0096 # 02 Y:1994 02 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,811 $365 Not Implemented
IA0096 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,198 $350 Implemented
ME0120 # 05 Y:1994 05 1994 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $1,905 $1,500 Not Implemented
ME0120 # 04 Y:1994 04 1994 DIRECT WARMEST AIR TO COMBUSTION INTAKE $205 $400 Not Implemented
ME0120 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $263 $6,000 Not Implemented
ME0120 # 02 Y:1994 02 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $658 $200 Implemented
ME0120 # 01 Y:1994 01 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $25,173 $80,000 Implemented
AS0114 # 09 Y:1994 09 1994 USE PHOTOCELL CONTROLS $545 $60 Not Implemented
AS0114 # 08 Y:1994 08 1994 INSTALL OCCUPANCY SENSORS $2,525 $3,075 Not Implemented
AS0114 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,955 $16,200 Not Implemented
AS0114 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,597 $22,202 Not Implemented
AS0114 # 05 Y:1994 05 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,100 $2,367 Not Implemented
AS0114 # 04 Y:1994 04 1994 USE HEAT PUMP FOR SPACE CONDITIONING $17,728 $34,200 Not Implemented
AS0114 # 03 Y:1994 03 1994 INSULATE BARE EQUIPMENT $1,549 $588 Not Implemented
AS0114 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $606 $200 Not Implemented
AS0114 # 01 Y:1994 01 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $434 $300 Not Implemented
AM0202 # 01 Y:1994 01 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $36,010 $0 Not Implemented
AM0202 # 04 Y:1994 04 1994 PAY UTILITY BILLS ON TIME $608 $0 Not Implemented
AM0202 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $915 $100 Implemented