Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
128
matching recommendationsSIC | 3519 | Internal Combustion Engines, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LL0314 # 05 Y:2009 | 05 | 2009 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,851 | $840 | Not Implemented |
LL0314 # 01 Y:2009 | 01 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $149,374 | $64,560 | Implemented |
LL0314 # 03 Y:2009 | 03 | 2009 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $59,298 | $5,092 | Not Implemented |
LL0314 # 04 Y:2009 | 04 | 2009 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $5,010 | $1,350 | Implemented |
LL0314 # 02 Y:2009 | 02 | 2009 | INSULATE BARE EQUIPMENT | $74,110 | $7,510 | Implemented |
LL0314 # 09 Y:2009 | 09 | 2009 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $381 | $120 | Not Implemented |
LL0314 # 06 Y:2009 | 06 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,119 | $770 | Implemented |
LL0314 # 07 Y:2009 | 07 | 2009 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $520 | $775 | Not Implemented |
LL0314 # 08 Y:2009 | 08 | 2009 | INSTALL OCCUPANCY SENSORS | $291 | $180 | Not Implemented |
OK0762 # 06 Y:2008 | 06 | 2008 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $238,891 | $232,766 | Implemented |
OK0762 # 05 Y:2008 | 05 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $31,605 | $1,000 | Implemented |
OK0762 # 07 Y:2008 | 07 | 2008 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $17,165 | $0 | Implemented |
OK0762 # 02 Y:2008 | 02 | 2008 | INSTALL SKYLIGHTS | $14,224 | $54,912 | Implemented |
OK0762 # 04 Y:2008 | 04 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,975 | $8,646 | Not Implemented |
OK0762 # 03 Y:2008 | 03 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $48,433 | $104,000 | Not Implemented |
OK0762 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $164,842 | $297,920 | Implemented |
MI0148 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,440 | $1,074 | Not Implemented |
MI0148 # 06 Y:2007 | 06 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,961 | $3,010 | Not Implemented |
MI0148 # 02 Y:2007 | 02 | 2007 | DISCONNECT BALLASTS | $5,169 | $2,150 | Not Implemented |
MI0148 # 07 Y:2007 | 07 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,128 | $1,423 | Not Implemented |
MI0148 # 08 Y:2007 | 08 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $452 | $160 | Not Implemented |
MI0148 # 01 Y:2007 | 01 | 2007 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,264 | $915 | Not Implemented |
MI0148 # 03 Y:2007 | 03 | 2007 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,272 | $10,200 | Not Implemented |
MI0148 # 04 Y:2007 | 04 | 2007 | INSTALL SKYLIGHTS | $5,197 | $16,736 | Not Implemented |
IC0109 # 06 Y:2005 | 06 | 2005 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $37,809 | $131,160 | Not Implemented |