IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

60

matching recommendations
Reset
SIC 352 Farm And Garden Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0454 # 11 Y:2012 11 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $424 $50 Implemented
WV0454 # 03 Y:2012 03 2012 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $4,992 $13,611 Not Implemented
WV0454 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,085 $108,401 Not Implemented
WV0454 # 10 Y:2012 10 2012 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $531 $1,000 Implemented
WV0454 # 09 Y:2012 09 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,183 $2,711 Not Implemented
WV0454 # 08 Y:2012 08 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,449 $468 Not Implemented
WV0454 # 07 Y:2012 07 2012 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $1,686 $2,767 Not Implemented
WV0454 # 06 Y:2012 06 2012 DEVELOP A REPAIR/REPLACE POLICY $1,836 $775 Implemented
WV0454 # 04 Y:2012 04 2012 USE RADIANT HEATER FOR SPOT HEATING $3,789 $19,607 Not Implemented
WV0454 # 02 Y:2012 02 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,088 $7,920 Not Implemented
WV0454 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,331 $11,667 Not Implemented
UD0765 # 11 Y:2007 11 2007 INSTALL SKYLIGHTS $354 $1,083 Implemented
UD0765 # 02 Y:2007 02 2007 USE SOLAR HEAT TO HEAT MAKE-UP AIR $4,626 $17,500 Not Implemented
UD0765 # 01 Y:2007 01 2007 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $9,128 $3,450 Implemented
UD0765 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,922 $7,945 Implemented
UD0765 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $997 $0 Implemented
UD0765 # 12 Y:2007 12 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $233 $500 Implemented
UD0765 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,808 $3,777 Implemented
UD0765 # 08 Y:2007 08 2007 INSTALL SKYLIGHTS $666 $2,421 Implemented
UD0765 # 10 Y:2007 10 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $496 $0 Implemented
UD0765 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,628 $915 Implemented
UD0765 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $764 $883 Implemented
UD0765 # 09 Y:2007 09 2007 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $500 $0 Implemented
UD0765 # 13 Y:2007 13 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $216 $324 Implemented
UD0741 # 08 Y:2006 08 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,097 $0 Implemented