IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 352 Farm And Garden Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0764 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,750 $710 Implemented
GT0764 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $620 $1,555 Implemented
GT0764 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,150 $5,635 Implemented
GT0764 # 03 Y:2003 03 2003 COVER OPEN TANKS $7,550 $2,505 Not Implemented
GT0764 # 06 Y:2003 06 2003 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $17,500 $38,000 Not Implemented
GT0764 # 02 Y:2003 02 2003 USE SYNTHETIC LUBRICANT $1,055 $0 Not Implemented
GT0764 # 01 Y:2003 01 2003 COVER OPEN TANKS $17,200 $0 Implemented
GT0764 # 08 Y:2003 08 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,368 $36,246 Implemented
UD0675 # 08 Y:2003 08 2003 REDUCE FLUID FLOW RATES $2,011 $1,200 Not Implemented
UD0675 # 15 Y:2003 15 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $205 $432 Implemented
UD0675 # 14 Y:2003 14 2003 ADD AREA LIGHTING SWITCHES $240 $200 Not Implemented
UD0675 # 13 Y:2003 13 2003 TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS $250 $424 Not Implemented
UD0675 # 12 Y:2003 12 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $430 $100 Implemented
UD0675 # 11 Y:2003 11 2003 RECOVER WASTE HEAT FROM EQUIPMENT $525 $1,750 Not Implemented
UD0675 # 10 Y:2003 10 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $695 $0 Implemented
UD0675 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,480 $9,600 Not Implemented
UD0675 # 07 Y:2003 07 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,355 $280 Implemented
UD0675 # 06 Y:2003 06 2003 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $3,068 $384 Implemented
UD0675 # 05 Y:2003 05 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,130 $0 Implemented
UD0675 # 04 Y:2003 04 2003 COMBINE UTILITY METERS $4,000 $0 Not Implemented
UD0675 # 03 Y:2003 03 2003 OPTIMIZE PLANT POWER FACTOR $7,934 $2,500 Not Implemented
UD0675 # 02 Y:2003 02 2003 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $10,610 $1,200 Implemented
UD0675 # 01 Y:2003 01 2003 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $26,842 $625 Implemented
OR0429 # 05 Y:2003 05 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,025 $150 Not Implemented
OR0429 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,380 $2,400 Not Implemented