Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
21
matching recommendationsSIC | 352 | Farm And Garden Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0090 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $565 | $831 | Not Implemented |
NL0090 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $822 | $1,190 | Not Implemented |
NL0090 # 04 Y:2023 | 04 | 2023 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,454 | $1,764 | Not Implemented |
NL0090 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,382 | $4,500 | Implemented |
NL0090 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,629 | $7,670 | Implemented |
NL0090 # 01 Y:2023 | 01 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $10,602 | $19,848 | Implemented |
MZ0348 # 02 Y:2023 | 02 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,209 | $3,330 | Not Implemented |
MZ0348 # 07 Y:2023 | 07 | 2023 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $2,203 | $4,132 | Not Implemented |
MZ0348 # 06 Y:2023 | 06 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,751 | $5,386 | Implemented |
MZ0348 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $3,429 | $830 | Not Implemented |
MZ0348 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,917 | $1,548 | Implemented |
MZ0348 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,900 | $2,660 | Not Implemented |
MZ0348 # 01 Y:2023 | 01 | 2023 | OPTIMIZE PLANT POWER FACTOR | $13,016 | $3,000 | Implemented |
SD0631 # 01 Y:2023 | 01 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,583 | $10,494 | Not Implemented |
SD0631 # 02 Y:2023 | 02 | 2023 | USE BATTERY STORAGE FOR DEMAND CONTROL | $15,108 | $70,650 | Not Implemented |
SD0631 # 03 Y:2023 | 03 | 2023 | USE PHOTOCELL CONTROLS | $754 | $1,124 | Implemented |
SD0631 # 04 Y:2023 | 04 | 2023 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $3,553 | $3,535 | Not Implemented |
SD0631 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,208 | $16,000 | Not Implemented |
SD0631 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $928 | $2,934 | Not Implemented |
SD0631 # 07 Y:2023 | 07 | 2023 | INSULATE BARE EQUIPMENT | $1,509 | $4,973 | Not Implemented |
SD0631 # 08 Y:2023 | 08 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,593 | $4,339 | Not Implemented |