Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsSIC | 3523 | Farm Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0924 # 05 Y:2019 | 05 | 2019 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $174,595 | $1,725,000 | Not Implemented |
GT0924 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,833 | $79,937 | Implemented |
GT0924 # 03 Y:2019 | 03 | 2019 | INSTALL OCCUPANCY SENSORS | $5,577 | $13,969 | Implemented |
GT0924 # 02 Y:2019 | 02 | 2019 | INSULATE BARE EQUIPMENT | $7,338 | $6,225 | Not Implemented |
GT0924 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,068 | $3,500 | Implemented |
GT0654 # 06 Y:1998 | 06 | 1998 | PAY UTILITY BILLS ON TIME | $1,330 | $0 | Implemented |
GT0654 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,734 | $12,757 | Not Implemented |
GT0654 # 02 Y:1998 | 02 | 1998 | INSTALL OCCUPANCY SENSORS | $150 | $52 | Not Implemented |
GT0654 # 03 Y:1998 | 03 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $170 | $108 | Not Implemented |
GT0654 # 04 Y:1998 | 04 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $737 | $150 | Implemented |
GT0654 # 05 Y:1998 | 05 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $200 | $0 | Implemented |
GT0654 # 07 Y:1998 | 07 | 1998 | MINIMIZE WATER USAGE | $935 | $1,100 | Not Implemented |
GT0654 # 08 Y:1998 | 08 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $3,740 | $5,000 | Implemented |
GT0621 # 04 Y:1997 | 04 | 1997 | COVER OPEN TANKS | $4,950 | $5,000 | Not Implemented |
GT0621 # 07 Y:1997 | 07 | 1997 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $6,600 | $6,600 | Not Implemented |
GT0621 # 06 Y:1997 | 06 | 1997 | METER WASTE WATER | $170 | $0 | Not Implemented |
GT0621 # 05 Y:1997 | 05 | 1997 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $38,180 | $0 | Implemented |
GT0621 # 03 Y:1997 | 03 | 1997 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,020 | $1,590 | Implemented |
GT0621 # 02 Y:1997 | 02 | 1997 | INSTALL BACK-UP EQUIPMENT | $124,259 | $82,550 | Not Implemented |
GT0621 # 01 Y:1997 | 01 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,160 | $200 | Implemented |
GT0522 # 06 Y:1994 | 06 | 1994 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $30 | $10 | Not Implemented |
GT0522 # 05 Y:1994 | 05 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $240 | $650 | Implemented |
GT0522 # 04 Y:1994 | 04 | 1994 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,600 | $2,590 | Not Implemented |
GT0522 # 03 Y:1994 | 03 | 1994 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,400 | $800 | Not Implemented |
GT0522 # 02 Y:1994 | 02 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,080 | $16,090 | Implemented |