IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 3523 Farm Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0924 # 05 Y:2019 05 2019 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $174,595 $1,725,000 Not Implemented
GT0924 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,833 $79,937 Implemented
GT0924 # 03 Y:2019 03 2019 INSTALL OCCUPANCY SENSORS $5,577 $13,969 Implemented
GT0924 # 02 Y:2019 02 2019 INSULATE BARE EQUIPMENT $7,338 $6,225 Not Implemented
GT0924 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,068 $3,500 Implemented
GT0654 # 06 Y:1998 06 1998 PAY UTILITY BILLS ON TIME $1,330 $0 Implemented
GT0654 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,734 $12,757 Not Implemented
GT0654 # 02 Y:1998 02 1998 INSTALL OCCUPANCY SENSORS $150 $52 Not Implemented
GT0654 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $170 $108 Not Implemented
GT0654 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $737 $150 Implemented
GT0654 # 05 Y:1998 05 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $200 $0 Implemented
GT0654 # 07 Y:1998 07 1998 MINIMIZE WATER USAGE $935 $1,100 Not Implemented
GT0654 # 08 Y:1998 08 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $3,740 $5,000 Implemented
GT0621 # 04 Y:1997 04 1997 COVER OPEN TANKS $4,950 $5,000 Not Implemented
GT0621 # 07 Y:1997 07 1997 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $6,600 $6,600 Not Implemented
GT0621 # 06 Y:1997 06 1997 METER WASTE WATER $170 $0 Not Implemented
GT0621 # 05 Y:1997 05 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $38,180 $0 Implemented
GT0621 # 03 Y:1997 03 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,020 $1,590 Implemented
GT0621 # 02 Y:1997 02 1997 INSTALL BACK-UP EQUIPMENT $124,259 $82,550 Not Implemented
GT0621 # 01 Y:1997 01 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,160 $200 Implemented
GT0522 # 06 Y:1994 06 1994 SHUT OFF PILOTS IN STANDBY EQUIPMENT $30 $10 Not Implemented
GT0522 # 05 Y:1994 05 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $240 $650 Implemented
GT0522 # 04 Y:1994 04 1994 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,600 $2,590 Not Implemented
GT0522 # 03 Y:1994 03 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,400 $800 Not Implemented
GT0522 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,080 $16,090 Implemented