Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,727
matching recommendationsSIC | 353 | Construction And Related Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1082 # 04 Y:2024 | 04 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $35,677 | $0 | n/a |
UD1082 # 02 Y:2024 | 02 | 2024 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,315 | $760 | n/a |
UD1082 # 06 Y:2024 | 06 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $12,369 | $0 | n/a |
UD1082 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,327 | $9,308 | n/a |
UD1082 # 08 Y:2024 | 08 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $3,575 | $11,626 | n/a |
UD1082 # 09 Y:2024 | 09 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,739 | $18,600 | n/a |
UD1082 # 10 Y:2024 | 10 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $245 | $0 | n/a |
UD1082 # 05 Y:2024 | 05 | 2024 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $20,600 | $93,250 | n/a |
UD1082 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,232 | $1,235 | n/a |
UD1082 # 07 Y:2024 | 07 | 2024 | INSTALL OCCUPANCY SENSORS | $1,431 | $2,001 | n/a |
WM0208 # 04 Y:2024 | 04 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,796 | $0 | n/a |
WM0208 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,014 | $4,664 | n/a |
WM0208 # 02 Y:2024 | 02 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $9,702 | $8,700 | n/a |
WM0208 # 05 Y:2024 | 05 | 2024 | USE COMPRESSOR AIR FILTERS | $3,395 | $4,786 | n/a |
WM0208 # 07 Y:2024 | 07 | 2024 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $430 | $700 | n/a |
WM0208 # 01 Y:2024 | 01 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $37,878 | $122,100 | n/a |
WM0208 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,761 | $1,950 | n/a |
WV0654 # 17 Y:2023 | 17 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $176 | $240 | n/a |
WV0654 # 06 Y:2023 | 06 | 2023 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $1,462 | $5,940 | n/a |
WV0654 # 08 Y:2023 | 08 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,093 | $1,113 | n/a |
WV0654 # 01 Y:2023 | 01 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $12,942 | $63,000 | n/a |
WV0654 # 04 Y:2023 | 04 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,126 | $9,645 | n/a |
WV0654 # 07 Y:2023 | 07 | 2023 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,242 | $6,000 | n/a |
WV0654 # 05 Y:2023 | 05 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $3,551 | $9,700 | n/a |
WV0654 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,126 | $3,800 | n/a |