Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
22
matching recommendationsSIC | 353 | Construction And Related Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0754 # 02 Y:2022 | 02 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,033 | $3,560 | Implemented |
OR0754 # 01 Y:2022 | 01 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,871 | $2,675 | Implemented |
OR0748 # 05 Y:2022 | 05 | 2022 | INSULATE BARE EQUIPMENT | $2,032 | $9,520 | Implemented |
OR0748 # 04 Y:2022 | 04 | 2022 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $99,431 | $292,453 | Implemented |
OR0748 # 03 Y:2022 | 03 | 2022 | OPTIMIZE PLANT POWER FACTOR | $3,913 | $10,533 | Implemented |
OR0748 # 02 Y:2022 | 02 | 2022 | FILTER AND REUSE HYDRAULIC OIL | $34,830 | $88,699 | Implemented |
OR0748 # 01 Y:2022 | 01 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,763 | $1,880 | Implemented |
OR0608 # 02 Y:2013 | 02 | 2013 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $107,138 | $55,641 | Implemented |
OR0608 # 01 Y:2013 | 01 | 2013 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $32,340 | $0 | Implemented |
OR0065 # 04 Y:1989 | 04 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $394 | $279 | Implemented |
OR0065 # 06 Y:1989 | 06 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,845 | $2,000 | Implemented |
OR0065 # 03 Y:1989 | 03 | 1989 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $338 | $150 | Implemented |
OR0065 # 01 Y:1989 | 01 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,924 | $2,050 | Implemented |
OR0022 # 07 Y:1988 | 07 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $265 | $402 | Implemented |
OR0022 # 06 Y:1988 | 06 | 1988 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $99 | $146 | Implemented |
OR0022 # 05 Y:1988 | 05 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $267 | $300 | Implemented |
OR0022 # 04 Y:1988 | 04 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,969 | $6,119 | Implemented |
OR0022 # 02 Y:1988 | 02 | 1988 | INSTALL TIMERS AND/OR THERMOSTATS | $1,762 | $1,250 | Implemented |
OR0016 # 01 Y:1988 | 01 | 1988 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,173 | $0 | Implemented |
OR0016 # 04 Y:1988 | 04 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $147 | $200 | Implemented |
OR0016 # 03 Y:1988 | 03 | 1988 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,304 | $200 | Implemented |
OR0016 # 02 Y:1988 | 02 | 1988 | INSTALL SET-BACK TIMERS | $4,547 | $270 | Implemented |