IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

88

matching recommendations
Reset
SIC 353 Construction And Related Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1084 # 04 Y:2024 04 2024 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $47,804 $143,413 n/a
UD1084 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,258 $1,235 n/a
UD1084 # 01 Y:2024 01 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,386 $0 n/a
UD1084 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,134 $3,775 n/a
UD1084 # 05 Y:2024 05 2024 INSTALL OCCUPANCY SENSORS $1,251 $3,985 n/a
UD1084 # 03 Y:2024 03 2024 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,871 $6,080 n/a
UD1082 # 06 Y:2024 06 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $12,369 $0 n/a
UD1082 # 02 Y:2024 02 2024 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,315 $760 n/a
UD1082 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,327 $9,308 n/a
UD1082 # 10 Y:2024 10 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $245 $0 n/a
UD1082 # 04 Y:2024 04 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $35,677 $0 n/a
UD1082 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,232 $1,235 n/a
UD1082 # 09 Y:2024 09 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,739 $18,600 n/a
UD1082 # 05 Y:2024 05 2024 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $20,600 $93,250 n/a
UD1082 # 07 Y:2024 07 2024 INSTALL OCCUPANCY SENSORS $1,431 $2,001 n/a
UD1082 # 08 Y:2024 08 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,575 $11,626 n/a
CW0122 # 02 Y:2022 02 2022 RECOVER WASTE HEAT FROM EQUIPMENT $3,767 $400 n/a
CW0122 # 06 Y:2022 06 2022 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $42,376 $188,648 n/a
CW0122 # 05 Y:2022 05 2022 UPGRADE CONTROLS ON COMPRESSORS $13,037 $60,000 n/a
CW0122 # 04 Y:2022 04 2022 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $25,171 $73,990 n/a
CW0122 # 03 Y:2022 03 2022 CONVERT TO ROBOTIC PAINTING $102,960 $48,500 n/a
CW0122 # 01 Y:2022 01 2022 TREAT AND REUSE RINSE WATERS $11,974 $2,500 n/a
CW0121 # 06 Y:2022 06 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $461 $517 Implemented
CW0121 # 05 Y:2022 05 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $31,088 $86,330 Implemented
CW0121 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,231 $26,058 Implemented