IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,768

matching recommendations
Reset
SIC 353 Construction And Related Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0903 # 05 Y:2015 05 2015 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $407 $1,125 Not Implemented
OK0903 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,717 $11,876 Not Implemented
OK0903 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $2,170 $8,887 Not Implemented
OK0903 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $3,490 $2,440 Not Implemented
OK0903 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,183 $950 Implemented
OK0903 # 10 Y:2015 10 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,904 $10,062 Implemented
OK0903 # 11 Y:2015 11 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,427 $2,112 Not Implemented
OK0903 # 12 Y:2015 12 2015 INSULATE BARE EQUIPMENT $195 $240 Not Implemented
BD0455 # 01 Y:2015 01 2015 USE RADIANT HEATER FOR SPOT HEATING $140,934 $105,000 Not Implemented
BD0455 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $19,322 $13,700 Implemented
BD0455 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,997 $40,950 Implemented
BD0455 # 04 Y:2015 04 2015 INSTALL TIMERS AND/OR THERMOSTATS $11,689 $17,188 Not Implemented
BD0455 # 05 Y:2015 05 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $7,295 $25 Implemented
BD0455 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $6,580 $2,250 Implemented
BD0455 # 07 Y:2015 07 2015 USE SYNTHETIC LUBRICANT $4,742 $300 Not Implemented
BD0455 # 08 Y:2015 08 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,994 $900 Implemented
BD0455 # 09 Y:2015 09 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,388 $25 Implemented
BD0455 # 10 Y:2015 10 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $845 $2,500 Not Implemented
BD0455 # 11 Y:2015 11 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $839 $725 Implemented
BD0455 # 12 Y:2015 12 2015 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $157,388 $8,500 Not Implemented
OK0901 # 01 Y:2014 01 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,026 $1,766 Not Implemented
OK0901 # 02 Y:2014 02 2014 RECOVER WASTE HEAT FROM EQUIPMENT $3,047 $1,378 Not Implemented
OK0901 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,102 $1,890 Not Implemented
OK0901 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,328 $24,267 Not Implemented
OK0901 # 05 Y:2014 05 2014 INSTALL TIMERS AND/OR THERMOSTATS $156 $606 Not Implemented