IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,768

matching recommendations
Reset
SIC 353 Construction And Related Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0608 # 01 Y:2013 01 2013 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $32,340 $0 Implemented
OR0608 # 02 Y:2013 02 2013 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $107,138 $55,641 Implemented
OR0608 # 03 Y:2013 03 2013 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $125,546 $300,000 Not Implemented
OR0608 # 04 Y:2013 04 2013 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $11,970 $41,000 Not Implemented
OR0608 # 05 Y:2013 05 2013 INSULATE BARE EQUIPMENT $518 $135 Not Implemented
OR0608 # 06 Y:2013 06 2013 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $2,698 $1,220 Not Implemented
OR0608 # 07 Y:2013 07 2013 USE PHOTOCELL CONTROLS $658 $966 Not Implemented
BD0428 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,115 $39,240 Implemented
BD0428 # 02 Y:2013 02 2013 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $31,849 $76,000 Not Implemented
BD0428 # 03 Y:2013 03 2013 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,262 $15,000 Implemented
BD0428 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,563 $20 Not Implemented
BD0428 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $4,430 $2,257 Not Implemented
BD0428 # 06 Y:2013 06 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,903 $1,400 Not Implemented
BD0428 # 07 Y:2013 07 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,310 $2,000 Implemented
BD0428 # 08 Y:2013 08 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,273 $3,150 Not Implemented
BS0014 # 01 Y:2013 01 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,378 $1,732 Not Implemented
BS0014 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,556 $523 Not Implemented
BS0014 # 03 Y:2013 03 2013 HEAT WATER WITH EXHAUST HEAT $7,448 $7,432 Not Implemented
BS0014 # 04 Y:2013 04 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,948 $14,095 Not Implemented
BS0014 # 05 Y:2013 05 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,647 $48,320 Not Implemented
BS0014 # 06 Y:2013 06 2013 INSTALL OCCUPANCY SENSORS $94 $230 Not Implemented
BS0014 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $79 $324 Not Implemented
BS0014 # 08 Y:2013 08 2013 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $621 $299 Not Implemented
BS0014 # 09 Y:2013 09 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $190 $180 Not Implemented
LE0351 # 01 Y:2013 01 2013 INSTALL OCCUPANCY SENSORS $5,155 $7,480 Implemented