Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,768
matching recommendationsSIC | 353 | Construction And Related Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0464 # 07 Y:2004 | 07 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $550 | $175 | Not Implemented |
AM0464 # 08 Y:2004 | 08 | 2004 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $26,000 | $18,000 | Implemented |
AM0464 # 09 Y:2004 | 09 | 2004 | REUSE RAGS UNTIL COMPLETELY SOILED | $3,900 | $0 | Not Implemented |
IC0080 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,301 | $900 | Implemented |
IC0080 # 02 Y:2004 | 02 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,280 | $10,420 | Implemented |
IC0080 # 03 Y:2004 | 03 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,046 | $0 | Implemented |
IC0080 # 04 Y:2004 | 04 | 2004 | INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK | $40,931 | $95,360 | Implemented |
IC0080 # 05 Y:2004 | 05 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,354 | $2,640 | Implemented |
IC0080 # 06 Y:2004 | 06 | 2004 | USE OPTIMUM TEMPERATURE | $24,757 | $53,496 | Not Implemented |
IC0080 # 07 Y:2004 | 07 | 2004 | USE OPTIMUM TEMPERATURE | $62,610 | $35,948 | Implemented |
IC0080 # 08 Y:2004 | 08 | 2004 | INSTALL TIMERS AND/OR THERMOSTATS | $377 | $1,384 | Not Implemented |
IC0080 # 09 Y:2004 | 09 | 2004 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $1,154 | $10,967 | Not Implemented |
IC0080 # 10 Y:2004 | 10 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,008 | $11,878 | Not Implemented |
IC0080 # 11 Y:2004 | 11 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $413 | $1,540 | Implemented |
IC0080 # 12 Y:2004 | 12 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $787 | $896 | Implemented |
IC0080 # 13 Y:2004 | 13 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $232 | $49 | Implemented |
IC0080 # 14 Y:2004 | 14 | 2004 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $258 | $0 | Implemented |
UF0338 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,833 | $376 | Implemented |
UF0338 # 02 Y:2004 | 02 | 2004 | IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM | $17,356 | $246 | Not Implemented |
UF0338 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,636 | $15,747 | Not Implemented |
UF0338 # 04 Y:2004 | 04 | 2004 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,517 | $20,000 | Not Implemented |
UF0338 # 05 Y:2004 | 05 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,081 | $0 | Not Implemented |
UF0338 # 06 Y:2004 | 06 | 2004 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $6,607 | $200 | Not Implemented |
UF0338 # 07 Y:2004 | 07 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,694 | $7,494 | Not Implemented |
UF0338 # 08 Y:2004 | 08 | 2004 | METER WASTE WATER | $1,403 | $1,500 | Not Implemented |