IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,768

matching recommendations
Reset
SIC 353 Construction And Related Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0623 # 10 Y:2022 10 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,877 $2,813 Implemented
WV0623 # 11 Y:2022 11 2022 UPGRADE CONTROLS ON COMPRESSORS $1,756 $299 Implemented
WV0623 # 12 Y:2022 12 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,660 $3,000 Implemented
WV0623 # 13 Y:2022 13 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,487 $990 Implemented
WV0623 # 14 Y:2022 14 2022 DEVELOP A REPAIR/REPLACE POLICY $1,356 $2,300 Implemented
WV0623 # 15 Y:2022 15 2022 UPGRADE CONTROLS ON COMPRESSORS $1,341 $4,835 Implemented
WV0623 # 16 Y:2022 16 2022 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $313 $1,500 Not Implemented
AM0848 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,136 $13 Not Implemented
AM0848 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,821 $1,000 Implemented
AM0848 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $889 $1,568 Implemented
AM0848 # 04 Y:2022 04 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $149 $408 Implemented
MU0001 # 01 Y:2022 01 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,472 $0 Not Implemented
MU0001 # 02 Y:2022 02 2022 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $2,156 $3,960 Implemented
MU0001 # 03 Y:2022 03 2022 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $2,694 $600 Implemented
MU0001 # 04 Y:2022 04 2022 OPERATE BOILERS ON HIGH FIRE SETTING $2,532 $146 Implemented
MU0001 # 05 Y:2022 05 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $7,097 $16,000 Not Implemented
MU0001 # 06 Y:2022 06 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $228 $0 Implemented
CW0122 # 01 Y:2022 01 2022 TREAT AND REUSE RINSE WATERS $11,974 $2,500 n/a
CW0122 # 02 Y:2022 02 2022 RECOVER WASTE HEAT FROM EQUIPMENT $3,767 $400 n/a
CW0122 # 03 Y:2022 03 2022 CONVERT TO ROBOTIC PAINTING $102,960 $48,500 n/a
CW0122 # 04 Y:2022 04 2022 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $25,171 $73,990 n/a
CW0122 # 05 Y:2022 05 2022 UPGRADE CONTROLS ON COMPRESSORS $13,037 $60,000 n/a
CW0122 # 06 Y:2022 06 2022 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $42,376 $188,648 n/a
AM0843 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $18,385 $33,511 Not Implemented
AM0843 # 02 Y:2022 02 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,030 $110 Not Implemented