IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,768

matching recommendations
Reset
SIC 353 Construction And Related Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0013 # 03 Y:1994 03 1994 INSTALL OCCUPANCY SENSORS $780 $820 Not Implemented
UM0013 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,013 $800 Implemented
UM0013 # 05 Y:1994 05 1994 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,171 $5,000 Not Implemented
UM0013 # 06 Y:1994 06 1994 USE RADIANT HEATER FOR SPOT HEATING $2,649 $6,400 Not Implemented
SF0039 # 01 Y:1994 01 1994 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,078 $4,752 Not Implemented
SF0039 # 02 Y:1994 02 1994 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,590 $2,750 Implemented
SF0039 # 03 Y:1994 03 1994 INSULATE BARE EQUIPMENT $2,733 $3,713 Implemented
SF0039 # 04 Y:1994 04 1994 INSTALL OCCUPANCY SENSORS $2,811 $2,400 Implemented
SF0039 # 05 Y:1994 05 1994 ADD AREA LIGHTING SWITCHES $1,444 $130 Implemented
SF0039 # 06 Y:1994 06 1994 OPTIMIZE PLANT POWER FACTOR $2,458 $4,153 Not Implemented
SF0039 # 07 Y:1994 07 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,811 $2,759 Implemented
UD0440 # 01 Y:1994 01 1994 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,448 $0 n/a
UD0440 # 02 Y:1994 02 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,640 $250 n/a
UD0440 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,786 $3,000 n/a
UD0440 # 04 Y:1994 04 1994 ADD AREA LIGHTING SWITCHES $2,496 $200 n/a
UD0440 # 05 Y:1994 05 1994 ADD AREA LIGHTING SWITCHES $1,454 $200 n/a
TN0515 # 01 Y:1994 01 1994 RECOVER WASTE HEAT FROM EQUIPMENT $2,200 $3,740 Not Implemented
TN0515 # 02 Y:1994 02 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,074 $1,300 Implemented
TN0515 # 03 Y:1994 03 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $5,662 $0 Implemented
TN0515 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,397 $600 Implemented
TN0515 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,167 $1,280 Not Implemented
TN0515 # 06 Y:1994 06 1994 USE DEMAND CONTROLLER OR LOAD SHEDDER $102,600 $20,800 Not Implemented
OK0446 # 01 Y:1994 01 1994 REDUCE VENTILATION AIR $8,869 $22,080 Not Implemented
OK0446 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,792 $2,333 Not Implemented
OK0446 # 03 Y:1994 03 1994 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,196 $0 Implemented