IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
Reset
SIC 353 Construction And Related Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0046 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,302 $64 Not Implemented
IP0046 # 03 Y:2015 03 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $122 $117 Not Implemented
IP0046 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,526 $4,032 Not Implemented
IP0046 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $348 $512 Not Implemented
IP0046 # 06 Y:2015 06 2015 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $6,619 $10,141 Not Implemented
IP0046 # 01 Y:2015 01 2015 UPGRADE OBSOLETE EQUIPMENT $1,665 $4 Not Implemented
IP0015 # 06 Y:2013 06 2013 INSULATE BARE EQUIPMENT $7,093 $380 Implemented
IP0015 # 01 Y:2013 01 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $1,644 $0 Implemented
IP0015 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,757 $0 Not Implemented
IP0015 # 03 Y:2013 03 2013 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $730 $0 Not Implemented
IP0015 # 08 Y:2013 08 2013 OPTIMIZE PLANT POWER FACTOR $10,702 $17,052 Not Implemented
IP0015 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,795 $8,625 Implemented
IP0015 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $1,044 $118 Not Implemented
IP0015 # 09 Y:2013 09 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,144 $3,702 Not Implemented
IP0015 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,010 $1,400 Implemented
UD0724 # 10 Y:2005 10 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,915 $0 Not Implemented
UD0724 # 09 Y:2005 09 2005 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $3,364 $0 Implemented
UD0724 # 08 Y:2005 08 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,477 $0 Not Implemented
UD0724 # 07 Y:2005 07 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,199 $7,500 Not Implemented
UD0724 # 06 Y:2005 06 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,922 $4,800 Not Implemented
UD0724 # 05 Y:2005 05 2005 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $9,550 $530 Not Implemented
UD0724 # 04 Y:2005 04 2005 INSULATE BARE EQUIPMENT $13,563 $6,505 Implemented
UD0724 # 03 Y:2005 03 2005 USE PHOTOCELL CONTROLS $16,400 $0 Implemented
UD0724 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,240 $102,000 Not Implemented
UD0724 # 01 Y:2005 01 2005 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $59,198 $30,000 Not Implemented