IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

44

matching recommendations
Reset
SIC 353 Construction And Related Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0425 # 01 Y:2024 01 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $6,979 $25,000 n/a
MS0425 # 06 Y:2024 06 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $64,575 $710,500 n/a
MS0425 # 05 Y:2024 05 2024 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,396 $255 n/a
MS0425 # 04 Y:2024 04 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,356 $0 n/a
MS0425 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,008 $1,523 n/a
MS0425 # 02 Y:2024 02 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $20,601 $8,975 n/a
MS0253 # 03 Y:2004 03 2004 USE RADIANT HEATER FOR SPOT HEATING $1,526 $4,000 Implemented
MS0253 # 07 Y:2004 07 2004 CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING $336 $68 Not Implemented
MS0253 # 06 Y:2004 06 2004 INSTALL TIMERS AND/OR THERMOSTATS $480 $708 Not Implemented
MS0253 # 05 Y:2004 05 2004 BURN WASTE OIL FOR HEAT $703 $2,190 Not Implemented
MS0253 # 08 Y:2004 08 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $198 $735 Implemented
MS0253 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,649 $4,689 Not Implemented
MS0253 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $853 $288 Implemented
MS0253 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,032 $11 Not Implemented
MS0240 # 08 Y:2003 08 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,629 $1,062 Not Implemented
MS0240 # 09 Y:2003 09 2003 USE SYNTHETIC LUBRICANT $846 $213 Not Implemented
MS0240 # 10 Y:2003 10 2003 DISCONNECT BALLASTS $198 $180 Implemented
MS0240 # 11 Y:2003 11 2003 INSULATE BARE EQUIPMENT $156 $260 Not Implemented
MS0240 # 01 Y:2003 01 2003 PREHEAT COMBUSTION AIR WITH WASTE HEAT $47,808 $4,800 Not Implemented
MS0240 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,534 $37,977 Not Implemented
MS0240 # 03 Y:2003 03 2003 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $18,919 $2,010 Not Implemented
MS0240 # 04 Y:2003 04 2003 INSTALL TIMERS AND/OR THERMOSTATS $15,997 $980 Implemented
MS0240 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,210 $228 Implemented
MS0240 # 06 Y:2003 06 2003 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,995 $528 Implemented
MS0240 # 07 Y:2003 07 2003 INSTALL TIMERS AND/OR THERMOSTATS $1,855 $827 Implemented