IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

449

matching recommendations
Reset
SIC 353 Construction And Related Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NT0006 # 06 Y:2023 06 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $151,941 $2,205,000 Not Implemented
NT0006 # 05 Y:2023 05 2023 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $16,552 $0 Not Implemented
NT0006 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $12,361 $27,064 Not Implemented
NT0006 # 03 Y:2023 03 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $15,942 $0 Not Implemented
NT0006 # 02 Y:2023 02 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,685 $0 Not Implemented
NT0006 # 01 Y:2023 01 2023 UPGRADE CONTROLS ON COMPRESSORS $34,941 $10,056 Not Implemented
AM0855 # 02 Y:2022 02 2022 OPTIMIZE PLANT POWER FACTOR $7,487 $13,455 Not Implemented
AM0855 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,650 $1,000 Implemented
AM0855 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,775 $2,575 Not Implemented
AM0855 # 07 Y:2022 07 2022 INSTALL OCCUPANCY SENSORS $410 $1,085 Implemented
AM0855 # 06 Y:2022 06 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $830 $2,100 Implemented
AM0855 # 01 Y:2022 01 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $32,345 $5,000 Implemented
AM0855 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $2,135 $0 Implemented
AM0848 # 04 Y:2022 04 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $149 $408 Implemented
AM0848 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,821 $1,000 Implemented
AM0848 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,136 $13 Not Implemented
AM0848 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $889 $1,568 Implemented
AM0843 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,975 $3,000 Not Implemented
AM0843 # 08 Y:2022 08 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $180 $160 Not Implemented
AM0843 # 07 Y:2022 07 2022 INSTALL OCCUPANCY SENSORS $18 $84 Not Implemented
AM0843 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $228 $1,190 Implemented
AM0843 # 02 Y:2022 02 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,030 $110 Not Implemented
AM0843 # 05 Y:2022 05 2022 INSTALL SUB-METERING EQUIPMENT $2,741 $500 Not Implemented
AM0843 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $18,385 $33,511 Not Implemented
AM0843 # 03 Y:2022 03 2022 COMBINE UTILITY METERS $7,115 $4,500 Not Implemented