Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
71
matching recommendationsSIC | 353 | Construction And Related Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0654 # 04 Y:2023 | 04 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,126 | $9,645 | n/a |
WV0654 # 08 Y:2023 | 08 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,093 | $1,113 | n/a |
WV0654 # 10 Y:2023 | 10 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $648 | $3,230 | n/a |
WV0654 # 05 Y:2023 | 05 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $3,551 | $9,700 | n/a |
WV0654 # 07 Y:2023 | 07 | 2023 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,242 | $6,000 | n/a |
WV0654 # 15 Y:2023 | 15 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $226 | $970 | n/a |
WV0654 # 17 Y:2023 | 17 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $176 | $240 | n/a |
WV0654 # 14 Y:2023 | 14 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $282 | $1,370 | n/a |
WV0654 # 13 Y:2023 | 13 | 2023 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $493 | $1,500 | n/a |
WV0654 # 12 Y:2023 | 12 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $554 | $150 | n/a |
WV0654 # 11 Y:2023 | 11 | 2023 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $612 | $1,300 | n/a |
WV0654 # 09 Y:2023 | 09 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $951 | $330 | n/a |
WV0654 # 06 Y:2023 | 06 | 2023 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $1,462 | $5,940 | n/a |
WV0654 # 16 Y:2023 | 16 | 2023 | INSULATE BARE EQUIPMENT | $190 | $98 | n/a |
WV0654 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,126 | $3,800 | n/a |
WV0654 # 03 Y:2023 | 03 | 2023 | REDUCE VENTILATION AIR | $5,594 | $13,814 | n/a |
WV0654 # 01 Y:2023 | 01 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $12,942 | $63,000 | n/a |
WV0641 # 09 Y:2023 | 09 | 2023 | INSULATE BARE EQUIPMENT | $402 | $758 | Implemented |
WV0641 # 08 Y:2023 | 08 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $917 | $933 | Implemented |
WV0641 # 07 Y:2023 | 07 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,857 | $5,425 | Implemented |
WV0641 # 02 Y:2023 | 02 | 2023 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $189,197 | $575,150 | Not Implemented |
WV0641 # 03 Y:2023 | 03 | 2023 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $123,784 | $178,886 | Not Implemented |
WV0641 # 01 Y:2023 | 01 | 2023 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $235,798 | $32,000 | Not Implemented |
WV0641 # 04 Y:2023 | 04 | 2023 | SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS | $42,136 | $4,100 | Implemented |
WV0641 # 06 Y:2023 | 06 | 2023 | REDUCE VENTILATION AIR | $16,843 | $4,400 | Implemented |