Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
81
matching recommendationsSIC | 353 | Construction And Related Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LT8395 # 01 Y:2023 | 01 | 2023 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $4,436 | $30,000 | n/a |
LT8395 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,671 | $285 | n/a |
LT8395 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,463 | $2,499 | n/a |
CC0027 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $176 | $351 | n/a |
CC0027 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,444 | $8,455 | n/a |
CC0027 # 08 Y:2023 | 08 | 2023 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $27,290 | $782,250 | n/a |
CC0027 # 07 Y:2023 | 07 | 2023 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $91 | $600 | n/a |
CC0027 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $7,831 | $93,870 | n/a |
CC0027 # 05 Y:2023 | 05 | 2023 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $26,412 | $80,000 | n/a |
CC0027 # 04 Y:2023 | 04 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,831 | $10,000 | n/a |
CC0027 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,571 | $25,000 | n/a |
WV0654 # 04 Y:2023 | 04 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,126 | $9,645 | Implemented |
WV0654 # 03 Y:2023 | 03 | 2023 | REDUCE VENTILATION AIR | $5,594 | $13,814 | Not Implemented |
WV0654 # 05 Y:2023 | 05 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $3,551 | $9,700 | Implemented |
WV0654 # 01 Y:2023 | 01 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $12,942 | $63,000 | Not Implemented |
WV0654 # 17 Y:2023 | 17 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $176 | $240 | Implemented |
WV0654 # 14 Y:2023 | 14 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $282 | $1,370 | Implemented |
WV0654 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,126 | $3,800 | Implemented |
WV0654 # 13 Y:2023 | 13 | 2023 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $493 | $1,500 | Implemented |
WV0654 # 06 Y:2023 | 06 | 2023 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $1,462 | $5,940 | Not Implemented |
WV0654 # 11 Y:2023 | 11 | 2023 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $612 | $1,300 | Not Implemented |
WV0654 # 08 Y:2023 | 08 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,093 | $1,113 | Implemented |
WV0654 # 07 Y:2023 | 07 | 2023 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,242 | $6,000 | Implemented |
WV0654 # 10 Y:2023 | 10 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $648 | $3,230 | Implemented |
WV0654 # 12 Y:2023 | 12 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $554 | $150 | Implemented |