IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

829

matching recommendations
Reset
SIC 3531 Construction Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0903 # 03 Y:2015 03 2015 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $3,411 $228 Implemented
OK0903 # 04 Y:2015 04 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,633 $30,000 Implemented
OK0903 # 05 Y:2015 05 2015 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $407 $1,125 Not Implemented
OK0903 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,717 $11,876 Not Implemented
OK0903 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $2,170 $8,887 Not Implemented
OK0903 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $3,490 $2,440 Not Implemented
OK0903 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,183 $950 Implemented
OK0903 # 10 Y:2015 10 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,904 $10,062 Implemented
OK0903 # 11 Y:2015 11 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,427 $2,112 Not Implemented
OK0903 # 12 Y:2015 12 2015 INSULATE BARE EQUIPMENT $195 $240 Not Implemented
WM0051 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,648 $27,260 Implemented
WM0051 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $15,358 $6,250 Not Implemented
WM0051 # 03 Y:2014 03 2014 INSULATE BARE EQUIPMENT $2,736 $800 Not Implemented
WM0051 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,050 $225 Implemented
WM0051 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,680 $3,200 Not Implemented
WM0051 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,680 $5,175 Not Implemented
WM0051 # 07 Y:2014 07 2014 PREHEAT COMBUSTION AIR WITH WASTE HEAT $9,345 $35,000 Not Implemented
WM0051 # 08 Y:2014 08 2014 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $14,378 $3,000 Not Implemented
WM0051 # 09 Y:2014 09 2014 REPLACE BOILER $11,306 $16,000 Implemented
UK1402 # 01 Y:2014 01 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,710 $4,500 Not Implemented
UK1402 # 02 Y:2014 02 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,696 $1,000 Not Implemented
UK1402 # 03 Y:2014 03 2014 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $2,530 $1,500 Not Implemented
UK1402 # 04 Y:2014 04 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,833 $0 Not Implemented
UK1402 # 05 Y:2014 05 2014 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $34,700 $40,000 Not Implemented
UK1402 # 06 Y:2014 06 2014 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,409 $0 Not Implemented