IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

823

matching recommendations
Reset
SIC 3531 Construction Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0998 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,784 $2,853 Implemented
OK0998 # 08 Y:2019 08 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,330 $1,074 Implemented
OK0998 # 09 Y:2019 09 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,516 $0 Not Implemented
OK0998 # 10 Y:2019 10 2019 OPTIMIZE PLANT POWER FACTOR $11,401 $14,332 Not Implemented
OK0998 # 11 Y:2019 11 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,712 $0 Not Implemented
OK0998 # 12 Y:2019 12 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,003 $0 Implemented
BS0114 # 07 Y:2018 07 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $8,591 $166,500 Not Implemented
BS0114 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $304 $337 Implemented
BS0114 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $601 $7 Not Implemented
BS0114 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,503 $11,880 Not Implemented
BS0114 # 03 Y:2018 03 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $423 $250 Implemented
BS0114 # 02 Y:2018 02 2018 CONVERT TO ELECTROSTATIC POWDER COATING $26,520 $21,600 Implemented
BS0114 # 01 Y:2018 01 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,222 $21,742 Not Implemented
OR0700 # 01 Y:2018 01 2018 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $7,430 $1,495 Not Implemented
OR0700 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,059 $6,826 Not Implemented
OR0700 # 03 Y:2018 03 2018 REPOSITION OVEN WALLS TO REDUCE HEATED SPACE $2,175 $5,389 Not Implemented
AM0735 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,250 $52,360 Implemented
AM0735 # 02 Y:2017 02 2017 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $8,320 $4,120 Not Implemented
AM0735 # 03 Y:2017 03 2017 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,770 $320 Implemented
AM0735 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $920 $1,700 Not Implemented
AM0735 # 05 Y:2017 05 2017 REUSE RAGS UNTIL COMPLETELY SOILED $880 $0 Implemented
AM0735 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,160 $500 Implemented
AM0735 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,105 $410 Implemented
AM0735 # 08 Y:2017 08 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $195 $15 Not Implemented
WV0542 # 01 Y:2017 01 2017 USE EVAPORATION TO CONCENTRATE MATERIAL $9,150 $45,000 Not Implemented