Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
306
matching recommendationsSIC | 3532 | Mining Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1601 # 02 Y:2016 | 02 | 2016 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $19,178 | $60,000 | Not Implemented |
UK1601 # 01 Y:2016 | 01 | 2016 | OPTIMIZE PLANT POWER FACTOR | $5,045 | $7,350 | Not Implemented |
NC0542 # 01 Y:2015 | 01 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,174 | $20,250 | Implemented |
NC0542 # 02 Y:2015 | 02 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,264 | $200 | Implemented |
NC0542 # 03 Y:2015 | 03 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,263 | $3,000 | Implemented |
NC0542 # 04 Y:2015 | 04 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $209 | $230 | Implemented |
NC0542 # 05 Y:2015 | 05 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,525 | $3,000 | Implemented |
NC0542 # 06 Y:2015 | 06 | 2015 | ISOLATE HOT OR COLD EQUIPMENT | $5,296 | $420 | Implemented |
NC0542 # 07 Y:2015 | 07 | 2015 | REDESIGN PROCESS | $2,648 | $500 | Not Implemented |
NC0542 # 08 Y:2015 | 08 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,576 | $510 | Implemented |
NC0542 # 09 Y:2015 | 09 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $3,364 | $5,865 | Implemented |
NC0542 # 10 Y:2015 | 10 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $741 | $140 | Implemented |
NC0542 # 11 Y:2015 | 11 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $580 | $144 | Implemented |
NC0542 # 12 Y:2015 | 12 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,925 | $8,373 | Implemented |
NC0542 # 13 Y:2015 | 13 | 2015 | INSTALL OCCUPANCY SENSORS | $1,213 | $500 | Implemented |
BD0455 # 02 Y:2015 | 02 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $19,322 | $13,700 | Implemented |
BD0455 # 01 Y:2015 | 01 | 2015 | USE RADIANT HEATER FOR SPOT HEATING | $140,934 | $105,000 | Not Implemented |
BD0455 # 11 Y:2015 | 11 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $839 | $725 | Implemented |
BD0455 # 12 Y:2015 | 12 | 2015 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $157,388 | $8,500 | Not Implemented |
BD0455 # 10 Y:2015 | 10 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $845 | $2,500 | Not Implemented |
BD0455 # 09 Y:2015 | 09 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,388 | $25 | Implemented |
BD0455 # 08 Y:2015 | 08 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,994 | $900 | Implemented |
BD0455 # 06 Y:2015 | 06 | 2015 | INSTALL OCCUPANCY SENSORS | $6,580 | $2,250 | Implemented |
BD0455 # 05 Y:2015 | 05 | 2015 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $7,295 | $25 | Implemented |
BD0455 # 04 Y:2015 | 04 | 2015 | INSTALL TIMERS AND/OR THERMOSTATS | $11,689 | $17,188 | Not Implemented |