Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2015 |
Principal Product | Brazed carbide tips |
NAICS | 333131 - Mining Machinery and Equipment Manufacturing |
SIC | 3532 - Mining Machinery |
Sales | $10,000,000-$50,000,000 |
# of Employees | 106 |
Plant Area (Sq.Ft.) | 57,500 |
Annual Production | 16,000,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | VA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $138,165 | 1,983,400 | kWh | $0.07 |
Electricity Demand | $56,288 | 7,183 | kW-months/year | $7.84 |
Natural Gas | $195,756 | 30,577 | MMBtu | $6.40 |
TOTAL ENERGY COSTS | $390,209 | |||
RECOMMENDED SAVINGS* | $45,778 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $43,130 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $21,174 Cost: $20,250 |
$21,174 | 302,488 | - | - | - | - | - | - | - | - |
$21,174 302,488 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,264 Cost: $200 |
$1,175 | 16,785 | $269 | 34 | - | - | $(-120) | - | $(-60) | - |
$1,175 16,785 kWh |
$269 34 kW-months/year |
- - MMBtu |
$(-120) - $ |
$(-60) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $4,263 Cost: $3,000 |
- | - | - | - | $4,263 | 744 | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,263 744 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $209 Cost: $230 |
$209 | 2,985 | - | - | - | - | - | - | - | - |
$209 2,985 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,525 Cost: $3,000 |
$1,247 | 17,810 | $278 | 36 | - | - | - | - | - | - |
$1,247 17,810 kWh |
$278 36 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2522 ISOLATE HOT OR COLD EQUIPMENT |
Savings: $5,296 Cost: $420 |
$4,328 | 61,826 | $968 | 124 | - | - | - | - | - | - |
$4,328 61,826 kWh |
$968 124 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.5194 REDESIGN PROCESS |
Savings: $2,648 Cost: $500 |
$2,164 | 30,912 | $484 | 62 | - | - | - | - | - | - |
$2,164 30,912 kWh |
$484 62 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,576 Cost: $510 |
- | - | - | - | $1,576 | 275 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,576 275 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $3,364 Cost: $5,865 |
$2,748 | 39,257 | $616 | 78 | - | - | - | - | - | - |
$2,748 39,257 kWh |
$616 78 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $741 Cost: $140 |
$605 | 8,645 | $136 | 17 | - | - | - | - | - | - |
$605 8,645 kWh |
$136 17 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $580 Cost: $144 |
$269 | 3,847 | $42 | 5 | - | - | - | - | $269 | - |
$269 3,847 kWh |
$42 5 kW-months/year |
- - MMBtu |
- - $ |
$269 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,925 Cost: $8,373 |
$1,337 | 19,104 | - | - | - | - | - | - | $588 | - |
$1,337 19,104 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$588 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,213 Cost: $500 |
$1,213 | 17,334 | - | - | - | - | - | - | - | - |
$1,213 17,334 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $45,778 Cost: $43,132 |
$36,469 | 520,993 | $2,793 | 356 | $5,839 | 1,019 | $(-120) | - | $797 | - | $36,469 520,993 kWh |
$2,793 356 kW-months/year |
$5,839 1,019 MMBtu |
$(-120) - $ |
$797 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $43,130 Cost: $42,632 |
$34,305 | 490,081 | $2,309 | 294 | $5,839 | 1,019 | $(-120) | - | $797 | - | $34,305 490,081 kWh |
$2,309 294 kW-months/year |
$5,839 1,019 MMBtu |
$(-120) - $ |
$797 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |