IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

295

matching recommendations
Reset
SIC 3532 Mining Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0067 # 05 Y:2003 05 2003 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $6,185 $485 Implemented
TA0067 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,970 $13,700 Not Implemented
TA0067 # 07 Y:2003 07 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $4,240 $0 Implemented
TA0067 # 08 Y:2003 08 2003 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $3,960 $2,510 Implemented
TA0067 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,910 $0 Implemented
TA0067 # 10 Y:2003 10 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,940 $200 Implemented
WI0449 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,913 $47,600 Not Implemented
WI0449 # 02 Y:2003 02 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $16,417 $29,500 Not Implemented
WI0449 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,045 $0 Not Implemented
WI0449 # 04 Y:2003 04 2003 INSTALL TIMERS AND/OR THERMOSTATS $16,308 $2,000 Not Implemented
WI0449 # 05 Y:2003 05 2003 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $5,783 $15,000 Not Implemented
WI0449 # 06 Y:2003 06 2003 REPLACE CLOTH RAGS WITH PAPER TOWELS $5,589 $0 Not Implemented
WI0449 # 07 Y:2003 07 2003 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,048 $3,500 Not Implemented
WI0449 # 08 Y:2003 08 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $905 $640 Not Implemented
UU0025 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,405 $13,567 Implemented
UU0025 # 02 Y:2002 02 2002 OPTIMIZE PLANT POWER FACTOR $3,455 $3,500 Implemented
UU0025 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,913 $260 Implemented
UU0025 # 04 Y:2002 04 2002 HEAT WATER DURING OFF-PEAK PERIODS AND STORE FOR LATER USE $1,056 $0 Implemented
UU0025 # 05 Y:2002 05 2002 RECOVER WASTE HEAT FROM EQUIPMENT $3,177 $1,760 Implemented
UU0025 # 06 Y:2002 06 2002 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $1,285 $30 Implemented
SU0114 # 01 Y:2001 01 2001 $26,000 $24,320 Not Implemented
SU0114 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $508 $0 Implemented
SU0114 # 03 Y:2001 03 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,310 $30 Implemented
SU0114 # 04 Y:2001 04 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,977 $1,030 Not Implemented
SU0114 # 05 Y:2001 05 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $88 $115 Not Implemented