Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
218
matching recommendationsSIC | 3533 | Oil And Gas Field Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1068 # 06 Y:2022 | 06 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,325 | $5,412 | Implemented |
OK1068 # 05 Y:2022 | 05 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $830 | $0 | Not Implemented |
OK1068 # 04 Y:2022 | 04 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,561 | $18,463 | Not Implemented |
OK1068 # 03 Y:2022 | 03 | 2022 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $5,553 | $3,192 | Implemented |
OK1068 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,141 | $1,208 | Implemented |
OK1068 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,103 | $0 | Implemented |
OK1064 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,414 | $774 | Implemented |
OK1064 # 03 Y:2022 | 03 | 2022 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $367 | $700 | Implemented |
OK1064 # 02 Y:2022 | 02 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $14,321 | $22,000 | Implemented |
OK1064 # 01 Y:2022 | 01 | 2022 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $9,509 | $2,061 | Not Implemented |
OK1024 # 04 Y:2020 | 04 | 2020 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $515 | $540 | Not Implemented |
OK1024 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,729 | $0 | Not Implemented |
OK1024 # 02 Y:2020 | 02 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,084 | $2,187 | Not Implemented |
OK1024 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,608 | $4,500 | Not Implemented |
OK1024 # 05 Y:2020 | 05 | 2020 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,437 | $3,178 | Not Implemented |
OK1024 # 06 Y:2020 | 06 | 2020 | INSTALL TIMERS AND/OR THERMOSTATS | $34,324 | $2,448 | Not Implemented |
OK1007 # 02 Y:2019 | 02 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $390 | $1,047 | Not Implemented |
OK1007 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,929 | $3,017 | Not Implemented |
OK1007 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,238 | $0 | Not Implemented |
OK1007 # 05 Y:2019 | 05 | 2019 | INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM | $96,866 | $35,244 | Not Implemented |
OK1007 # 04 Y:2019 | 04 | 2019 | OPTIMIZE PLANT POWER FACTOR | $2,995 | $1,980 | Not Implemented |
OK0966 # 01 Y:2017 | 01 | 2017 | REPLACE BOILER | $125,000 | $442,000 | Not Implemented |
OK0966 # 05 Y:2017 | 05 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,886 | $0 | Not Implemented |
OK0966 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,526 | $21,137 | Implemented |
OK0966 # 02 Y:2017 | 02 | 2017 | BASE UTILITY CHARGES ON USAGE RATHER THAN AREA OCCUPIED | $113,700 | $24,000 | Implemented |