IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

154

matching recommendations
Reset
SIC 3535 Conveyors And Conveying Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0110 # 03 Y:1994 03 1994 KEEP BOILER TUBES CLEAN $357 $200 Implemented
AM0193 # 03 Y:1993 03 1993 OPTIMIZE PLANT POWER FACTOR $4,660 $7,500 Implemented
AM0193 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,110 $800 Implemented
AM0193 # 07 Y:1993 07 1993 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $220 $0 Implemented
WI0175 # 02 Y:1993 02 1993 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,259 $0 Implemented
WI0175 # 04 Y:1993 04 1993 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,672 $4,650 Implemented
WI0175 # 07 Y:1993 07 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $740 $1,584 Implemented
TN0483 # 01 Y:1993 01 1993 INSULATE BARE EQUIPMENT $2,932 $175 Implemented
AM0035 # 03 Y:1988 03 1988 RECOVER WASTE HEAT FROM EQUIPMENT $938 $550 Implemented
AM0035 # 04 Y:1988 04 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $696 $85 Implemented
AM0035 # 05 Y:1988 05 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $580 $300 Implemented
AM0035 # 06 Y:1988 06 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $141 $128 Implemented
KU0195 # 02 Y:1986 02 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,374 $14 Implemented
KU0195 # 04 Y:1986 04 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,705 $0 Implemented
KU0195 # 05 Y:1986 05 1986 INSTALL TIMERS AND/OR THERMOSTATS $4,203 $106 Implemented
KU0195 # 06 Y:1986 06 1986 INSTALL SET-BACK TIMERS $1,360 $222 Implemented
KU0195 # 07 Y:1986 07 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $964 $600 Implemented
KU0195 # 08 Y:1986 08 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $148 $200 Implemented
KU0195 # 09 Y:1986 09 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $124 $200 Implemented
KU0195 # 10 Y:1986 10 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $229 $0 Implemented
KU0195 # 11 Y:1986 11 1986 INSTALL AUTOMATIC STACK DAMPER $456 $700 Implemented
KU0195 # 12 Y:1986 12 1986 IMPROVE LUBRICATION PRACTICES $495 $200 Implemented
KU0195 # 13 Y:1986 13 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $272 $0 Implemented
KU0174 # 04 Y:1985 04 1985 REDUCE VENTILATION AIR $140 $0 Implemented
ST0016 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,538 $136 Implemented