IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 3535 Conveyors And Conveying Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0388 # 05 Y:2011 05 2011 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $63,847 $26,000 Not Implemented
BD0388 # 04 Y:2011 04 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,581 $1,200 Not Implemented
BD0388 # 03 Y:2011 03 2011 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $2,470 $4,000 Not Implemented
BD0388 # 02 Y:2011 02 2011 USE RADIANT HEATER FOR SPOT HEATING $30,750 $20,000 Not Implemented
BD0388 # 01 Y:2011 01 2011 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $12,465 $60,000 Not Implemented
BD0283 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,780 $602 Not Implemented
BD0283 # 13 Y:2005 13 2005 $4,576 $502 Not Implemented
BD0283 # 12 Y:2005 12 2005 $31,608 $15 Not Implemented
BD0283 # 11 Y:2005 11 2005 MINIMIZE WATER USAGE $495 $0 Not Implemented
BD0283 # 09 Y:2005 09 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $352 $0 Implemented
BD0283 # 01 Y:2005 01 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $5,694 $3,003 Implemented
BD0283 # 03 Y:2005 03 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,828 $2 Implemented
BD0283 # 04 Y:2005 04 2005 USE RADIANT HEATER FOR SPOT HEATING $2,160 $361 Not Implemented
BD0283 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $1,700 $851 Implemented
BD0283 # 06 Y:2005 06 2005 USE PHOTOCELL CONTROLS $1,499 $5 Not Implemented
BD0283 # 07 Y:2005 07 2005 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,269 $400 Implemented
BD0283 # 08 Y:2005 08 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $709 $500 Implemented
BD0283 # 10 Y:2005 10 2005 REUSE / RECYCLE/ SELL PAPER PRODUCTS $542 $176 Implemented
WI0175 # 01 Y:1993 01 1993 RECOVER WASTE HEAT FROM EQUIPMENT $10,455 $8,000 Not Implemented
WI0175 # 02 Y:1993 02 1993 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,259 $0 Implemented
WI0175 # 03 Y:1993 03 1993 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,118 $675 Not Implemented
WI0175 # 04 Y:1993 04 1993 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,672 $4,650 Implemented
WI0175 # 05 Y:1993 05 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,329 $0 Not Implemented
WI0175 # 06 Y:1993 06 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $972 $800 Not Implemented
WI0175 # 07 Y:1993 07 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $740 $1,584 Implemented