IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17

matching recommendations
Reset
SIC 3537 Industrial Trucks And Tractors
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0343 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,120 $1,866 Not Implemented
IA0343 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $125 $70 Implemented
IA0343 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,173 $7,306 Implemented
IA0343 # 05 Y:2004 05 2004 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $817 $1,230 Not Implemented
IA0343 # 06 Y:2004 06 2004 RECOVER WASTE HEAT FROM EQUIPMENT $8,859 $9,696 Not Implemented
IA0343 # 07 Y:2004 07 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $39,733 $10,000 Implemented
IA0343 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,846 $446 Implemented
KU0236 # 10 Y:1987 10 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $172 $120 Implemented
KU0236 # 09 Y:1987 09 1987 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $194 $40 Not Implemented
KU0236 # 08 Y:1987 08 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $582 $120 Implemented
KU0236 # 07 Y:1987 07 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $691 $1,000 Not Implemented
KU0236 # 06 Y:1987 06 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $388 $0 Not Implemented
KU0236 # 05 Y:1987 05 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $725 $0 Implemented
KU0236 # 04 Y:1987 04 1987 IMPROVE LUBRICATION PRACTICES $905 $0 Not Implemented
KU0236 # 03 Y:1987 03 1987 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,055 $0 Implemented
KU0236 # 02 Y:1987 02 1987 INSTALL AUTOMATIC STACK DAMPER $1,183 $1,700 Not Implemented
KU0236 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,730 $8,946 Implemented