IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 3537 Industrial Trucks And Tractors
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0059 # 02 Y:2024 02 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $105 $600 n/a
MU0059 # 03 Y:2024 03 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,093 $1,951 n/a
MU0059 # 04 Y:2024 04 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $814 $2,920 n/a
MU0059 # 05 Y:2024 05 2024 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,373 $0 n/a
MU0059 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $960 $2,327 n/a
MU0059 # 07 Y:2024 07 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $778 $487 n/a
MU0059 # 08 Y:2024 08 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,664 $1,940 n/a
MU0059 # 09 Y:2024 09 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $9,279 $76,908 n/a
MU0059 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,763 $403 n/a
UM0216 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,496 $7,269 Not Implemented
UM0216 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $222 $620 Not Implemented
UM0216 # 04 Y:2002 04 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,000 $2,000 Not Implemented
UM0216 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,056 $500 Not Implemented
UM0216 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $1,100 $500 Not Implemented
UM0216 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,873 $1,125 Not Implemented
ND0360 # 07 Y:2000 07 2000 USE OPTIMUM TEMPERATURE $86 $20 Implemented
ND0360 # 06 Y:2000 06 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $337 $300 Not Implemented
ND0360 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,566 $560 Implemented
ND0360 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,809 $80 Not Implemented
ND0360 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $611 $730 Not Implemented
ND0360 # 02 Y:2000 02 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,495 $0 Not Implemented
ND0360 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $886 $3,912 Not Implemented