IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

928

matching recommendations
Reset
SIC 354 Metalworking Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0202 # 05 Y:1986 05 1986 IMPROVE LUBRICATION PRACTICES $568 $100 Implemented
KU0202 # 06 Y:1986 06 1986 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $486 $400 Implemented
KU0202 # 07 Y:1986 07 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $365 $0 Implemented
KU0202 # 08 Y:1986 08 1986 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $308 $0 Implemented
KU0202 # 09 Y:1986 09 1986 IMPROVE LUBRICATION PRACTICES $284 $300 Implemented
KU0202 # 10 Y:1986 10 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $210 $50 Implemented
KU0200 # 01 Y:1986 01 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,229 $14,500 Implemented
KU0200 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,130 $1,000 Implemented
KU0200 # 03 Y:1986 03 1986 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,694 $0 Implemented
KU0200 # 04 Y:1986 04 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $473 $0 Implemented
KU0200 # 05 Y:1986 05 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $198 $0 Implemented
KU0200 # 07 Y:1986 07 1986 RECOVER WASTE HEAT FROM EQUIPMENT $116 $150 Implemented
UD0198 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,294 $3,569 Implemented
UD0198 # 02 Y:1986 02 1986 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $630 $2,000 Implemented
MA0059 # 01 Y:1986 01 1986 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,336 $3,400 Implemented
MA0059 # 03 Y:1986 03 1986 INSTALL TIMERS AND/OR THERMOSTATS $3,217 $2,300 Implemented
UD0190 # 04 Y:1986 04 1986 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,631 $10,070 Implemented
GT0276 # 03 Y:1986 03 1986 USE DEMAND CONTROLLER OR LOAD SHEDDER $13,268 $1,500 Implemented
GT0276 # 04 Y:1986 04 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,040 $15,677 Implemented
GT0276 # 05 Y:1986 05 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $392 $863 Implemented
UD0183 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,945 $575 Implemented
AT0025 # 03 Y:1985 03 1985 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $74,001 $9,900 Implemented
AT0025 # 06 Y:1985 06 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,470 $0 Implemented
UD0169 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,315 $178 Implemented
UD0169 # 03 Y:1985 03 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $849 $0 Implemented