IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,933

matching recommendations
Reset
SIC 354 Metalworking Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0356 # 10 Y:2007 10 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $855 $1,900 Implemented
WV0356 # 11 Y:2007 11 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $715 $350 Implemented
WV0356 # 12 Y:2007 12 2007 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $697 $1,080 Implemented
WV0356 # 13 Y:2007 13 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $674 $155 Not Implemented
WV0356 # 14 Y:2007 14 2007 RECOVER WASTE HEAT FROM EQUIPMENT $587 $500 Not Implemented
WV0356 # 15 Y:2007 15 2007 DEVELOP A REPAIR/REPLACE POLICY $504 $270 Implemented
WV0356 # 16 Y:2007 16 2007 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $499 $280 Not Implemented
WV0356 # 17 Y:2007 17 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $488 $40 Implemented
TA0128 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,981 $1,440 Not Implemented
TA0128 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,627 $1,030 Not Implemented
TA0128 # 03 Y:2006 03 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $52,032 $10,650 Not Implemented
TA0128 # 04 Y:2006 04 2006 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $5,927 $0 Not Implemented
CO0584 # 01 Y:2006 01 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $210 $0 Not Implemented
CO0584 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,220 $31,750 Implemented
CO0584 # 03 Y:2006 03 2006 USE SOLAR HEAT TO HEAT MAKE-UP AIR $3,480 $21,810 Not Implemented
CO0584 # 04 Y:2006 04 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,130 $16,160 Not Implemented
CO0584 # 05 Y:2006 05 2006 USE SOLAR HEAT TO MAKE ELECTRICTY $1,500 $2,950 Not Implemented
CO0584 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $820 $740 Not Implemented
UD0738 # 01 Y:2006 01 2006 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $91,800 $6,000 Implemented
UD0738 # 02 Y:2006 02 2006 RECOVER AND REUSE WASTE MATERIAL $28,944 $2,000 Not Implemented
UD0738 # 03 Y:2006 03 2006 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $8,313 $0 Implemented
UD0738 # 04 Y:2006 04 2006 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $7,084 $0 Implemented
UD0738 # 05 Y:2006 05 2006 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,819 $0 Not Implemented
UD0738 # 06 Y:2006 06 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,479 $1,700 Not Implemented
UD0738 # 07 Y:2006 07 2006 RECOVER WASTE HEAT FROM EQUIPMENT $1,348 $500 Implemented