IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,933

matching recommendations
Reset
SIC 354 Metalworking Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0209 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,007 $7,427 Not Implemented
UM0209 # 02 Y:2002 02 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,675 $500 Not Implemented
UM0209 # 03 Y:2002 03 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $363 $100 Not Implemented
UM0209 # 04 Y:2002 04 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $298 $100 Not Implemented
UM0209 # 05 Y:2002 05 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $223 $1,229 Not Implemented
AM0407 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,330 $300 Implemented
AM0407 # 02 Y:2002 02 2002 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $920 $699 Not Implemented
AM0407 # 03 Y:2002 03 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $690 $210 Not Implemented
AM0407 # 04 Y:2002 04 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $190 $0 Implemented
AM0407 # 05 Y:2002 05 2002 REUSE RAGS UNTIL COMPLETELY SOILED $180 $0 Implemented
UD0632 # 01 Y:2001 01 2001 OPTIMIZE PLANT POWER FACTOR $94,812 $8,000 Implemented
UD0632 # 02 Y:2001 02 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $33,500 $6,000 Not Implemented
UD0632 # 03 Y:2001 03 2001 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $15,075 $0 Not Implemented
UD0632 # 04 Y:2001 04 2001 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,915 $0 Implemented
UD0632 # 05 Y:2001 05 2001 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $5,264 $0 Implemented
UD0632 # 06 Y:2001 06 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,400 $1,846 Not Implemented
UD0632 # 07 Y:2001 07 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,355 $0 Not Implemented
UD0632 # 08 Y:2001 08 2001 INSULATE BARE EQUIPMENT $315 $435 Not Implemented
UD0632 # 09 Y:2001 09 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $307 $12 Not Implemented
UD0632 # 10 Y:2001 10 2001 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $207 $300 Not Implemented
UM0191 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,160 $12,637 Not Implemented
UM0191 # 02 Y:2001 02 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $29,810 $40,000 Not Implemented
UM0191 # 03 Y:2001 03 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,050 $3,150 Implemented
UM0191 # 04 Y:2001 04 2001 CONDENSE OPERATION INTO ONE BUILDING $12,695 $10,000 Not Implemented
UM0191 # 05 Y:2001 05 2001 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,708 $1,250 Not Implemented