IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,933

matching recommendations
Reset
SIC 354 Metalworking Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0424 # 05 Y:1991 05 1991 IMPROVE LUBRICATION PRACTICES $3,278 $4,500 Implemented
TN0424 # 06 Y:1991 06 1991 KEEP LAMPS AND REFLECTORS CLEAN $2,594 $0 Implemented
TN0424 # 07 Y:1991 07 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,927 $390 Implemented
TN0424 # 08 Y:1991 08 1991 INSTALL SET-BACK TIMERS $1,885 $0 Implemented
TN0424 # 09 Y:1991 09 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,501 $1,340 Implemented
AS0026 # 01 Y:1991 01 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,341 $1,500 Not Implemented
AS0026 # 02 Y:1991 02 1991 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,948 $1,200 Not Implemented
AS0026 # 03 Y:1991 03 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $526 $1,000 Not Implemented
AS0026 # 04 Y:1991 04 1991 KEEP LAMPS AND REFLECTORS CLEAN $10,888 $0 Not Implemented
AS0026 # 05 Y:1991 05 1991 INSTALL SET-BACK TIMERS $702 $525 Not Implemented
AS0026 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $676 $274 Not Implemented
AS0026 # 07 Y:1991 07 1991 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $8,006 $3,100 Not Implemented
AS0026 # 08 Y:1991 08 1991 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $1,198 $0 Not Implemented
CO0212 # 01 Y:1991 01 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,100 $200 Implemented
CO0212 # 02 Y:1991 02 1991 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,300 $2,300 Implemented
CO0212 # 03 Y:1991 03 1991 INSTALL TIMERS AND/OR THERMOSTATS $4,840 $4,200 Implemented
CO0212 # 04 Y:1991 04 1991 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,061 $10,000 Implemented
CO0212 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $337 $559 Implemented
CO0212 # 06 Y:1991 06 1991 SCHEDULE USE OF ELEVATORS TO CONSERVE ENERGY $920 $300 Implemented
KU0339 # 01 Y:1991 01 1991 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $4,004 $700 Implemented
KU0339 # 02 Y:1991 02 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,315 $1,860 Implemented
KU0339 # 03 Y:1991 03 1991 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,071 $0 Implemented
KU0339 # 04 Y:1991 04 1991 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $1,066 $525 Implemented
KU0339 # 05 Y:1991 05 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $577 $350 Implemented
KU0339 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $83 $119 Implemented