IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
SIC 354 Metalworking Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0289 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,948 $180 Implemented
MA0289 # 03 Y:1993 03 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $486 $67 Implemented
MA0289 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,675 $4,811 Not Implemented
MA0289 # 01 Y:1993 01 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,282 $20,878 Implemented
GT0508 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,170 $1,780 Not Implemented
GT0508 # 05 Y:1993 05 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $360 $0 Not Implemented
GT0508 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,255 $9,240 Implemented
GT0508 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,615 $6,380 Implemented
GT0508 # 07 Y:1993 07 1993 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,900 $300 Not Implemented
GT0508 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $645 $1,130 Implemented
GT0508 # 06 Y:1993 06 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,590 $7,800 Not Implemented
UD0413 # 01 Y:1993 01 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,642 $0 Implemented
UD0413 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $655 $0 Not Implemented
UD0413 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,521 $7,698 Implemented
UD0413 # 04 Y:1993 04 1993 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,336 $82,000 Implemented
UD0413 # 05 Y:1993 05 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,344 $250 Implemented
WI0185 # 11 Y:1993 11 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,588 $5,000 Not Implemented
WI0185 # 12 Y:1993 12 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,112 $2,455 Not Implemented
WI0185 # 09 Y:1993 09 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,819 $0 Not Implemented
WI0185 # 08 Y:1993 08 1993 RECOVER WASTE HEAT FROM EQUIPMENT $2,577 $1,200 Not Implemented
WI0185 # 07 Y:1993 07 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,407 $0 Not Implemented
WI0185 # 06 Y:1993 06 1993 INSTALL OCCUPANCY SENSORS $3,859 $900 Not Implemented
WI0185 # 05 Y:1993 05 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,295 $0 Implemented
WI0185 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,556 $2,336 Implemented
WI0185 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,604 $77,000 Not Implemented