IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 354 Metalworking Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0644 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,387 $50,000 Not Implemented
NC0644 # 05 Y:2019 05 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,800 $0 Not Implemented
NC0644 # 04 Y:2019 04 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,639 $0 Not Implemented
NC0644 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,841 $25,826 Implemented
NC0644 # 02 Y:2019 02 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $23,191 $30,000 Implemented
NC0644 # 01 Y:2019 01 2019 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $28,909 $65,575 Implemented
MI0349 # 04 Y:2019 04 2019 REDUCE HEAT GAIN BY WINDOW TINTING $9,207 $13,256 Not Implemented
MI0349 # 09 Y:2019 09 2019 USE PHOTOCELL CONTROLS $1,282 $622 Implemented
MI0349 # 08 Y:2019 08 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,282 $200 Not Implemented
MI0349 # 07 Y:2019 07 2019 INSTALL OCCUPANCY SENSORS $3,414 $972 Implemented
MI0349 # 06 Y:2019 06 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,966 $2,644 Implemented
MI0349 # 05 Y:2019 05 2019 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $7,565 $9,500 Implemented
MI0349 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,623 $13,592 Implemented
MI0349 # 02 Y:2019 02 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $11,314 $3,100 Implemented
MI0349 # 01 Y:2019 01 2019 UTILIZE A LESS EXPENSIVE COOLING METHOD $30,080 $110,000 Not Implemented
SU0473 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,790 $0 Implemented
SU0473 # 09 Y:2019 09 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,728 $30,695 Not Implemented
SU0473 # 08 Y:2019 08 2019 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $167 $412 Not Implemented
SU0473 # 07 Y:2019 07 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,625 $4,006 Not Implemented
SU0473 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $192 $290 Implemented
SU0473 # 05 Y:2019 05 2019 REDUCE VENTILATION AIR $660 $925 Not Implemented
SU0473 # 04 Y:2019 04 2019 USE PHOTOCELL CONTROLS $916 $470 Not Implemented
SU0473 # 03 Y:2019 03 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $519 $200 Implemented
SU0473 # 02 Y:2019 02 2019 USE SYNTHETIC LUBRICANT $11,804 $0 Not Implemented